Commissioning
Oxi 7310
10
ba75931e03
12/2011
3
Commissioning
3.1
Scope of delivery
D.O. meter Oxi 7310
4 batteries 1.5 V Mignon type AA
Power pack
USB cable
Stand
Stand holder
Comprehensive operating manual
Short instructions
CD-ROM with
– USB drivers
– comprehensive operating manual
– software MultiLab Importer
3.2
Power supply
The Oxi 7310 is supplied with power in the following ways:
Mains operation with the supplied power pack.
Battery operation (4 x alkaline manganese batteries, type AA)
USB operation via a connected USB-B cable.
3.3
Initial commissioning
Perform the following activities:
Insert the supplied batteries
For mains operation: Connect the power pack
If necessary, mount the stand
Switch on the meter (see section 4.2 S
Set the date and time (see section 4.4.6 E
Содержание Oxi 7310
Страница 1: ...ba75931e03 12 2011 Oxi 7310 Oxi 7310P Operating manual D O meter Oxi 7310P Oxi 7310 Printermodul ...
Страница 56: ...Glossary Oxi 7310 56 ba75931e03 12 2011 ...
Страница 58: ...Index Oxi 7310 58 ba75931e03 12 2011 ...
Страница 59: ......