Commissioning, measuring, calibration
SensoLyt
®
900-P
14
ba75992e01
11/2012
9
Commissioning, measuring, calibration
9.1
Opening and closing the IDS plug connection
Opening the plug
connection
If necessary, clean the plug connection
Open the locking device (step 1)
Use your thumb and index finger to press the clips of the connector
together, and pull the connector out of the plug (step 2).
Closing the plug
connection
Make sure that the plug connection is completely dry and clean.
Align the guidance of the connector with the groove in the plug and insert
the connector in the unlocked plug until it catches (step 3).
Close the locking device (step 4).
2
4
3
1
Plug connection
closed and locked
Guidance
Groove