LR 925/01(-P)
Measurement / Operation
5
ba75825e03
12/2015
2
Measurement / Operation
2.1
Commissioning
Scope of delivery
Conductivity measuring cellLR 925/01(-P)
Operating manual
Preparing the
sensor for
measurement
LR 925/01
Connect the sensor to the meter.The sensor is
immediately ready to measure.
LR 925/01-P
Connect the sensor to an IDS connector of the
meter. To open and close the IDS plug connection
please follow the section 2.2 O
PENING
AND
CLOSING
THE
IDS
PLUG
CONNECTION
(LR 925/01-P).
The sensor is immediately ready to measure.
Connection cables in different lengths to connect
the LR 925/01-P sensor to the meter are listed in
chapter 6 W
EAR
PARTS
AND
ACCESSORIES
.
Содержание LR 925/01
Страница 2: ...Copyright 2016 Xylem Analytics Germany GmbH Printed in Germany...
Страница 13: ......