
4
ba15360e03
10/2014
Commissioning
K 500 / K 800
Commissioning
Combination elec-
trode K 800
Double rod elec-
trode K 500 +
R 503
For measurements with the K 500 electrode, a reference electrode is re-
quired (e.g. R 503). The two electrodes together form a double rod combina-
tion electrode.
1
Remove the storage vessel.
2
Fill ELY/BR/503/K bridge electrolyte into the filling opening so that
the inner junctions are covered with bridge electrolyte.
3
Rinse the combination electrode with deionized water.
4
Wipe the shaft using a clean paper towel.
1
Put the reference electrode into operation (see operating manual of
the reference electrode). Bridge electrolyte: ELY/BR/503/K.
2
Remove the protection cap of the electrode.
3
Rinse the electrode with deionized water.
4
Wipe the shaft using a clean paper towel.