MIQ/PS
Installation
3 - 3
ba64113e02
12/2005
Preparing the power line
Bild 3-1
Prepared power cable.
Caution
The protective earth conductor must not project into the housing.
Otherwise, malfunctions could occur.
1
Cut off the cable to the required length.
2
Strip the cable insulation for approx. 45 mm.
3
Bare the wires of phases L and N and fit them with wire end
sleeves.
4
If present, cut off the protective earth conductor wire at the end
of the cable sheath.
ca. 45 mm
L
N
cut protective conducter here
Luggage Point WRP Water Reclamation (MIQ/PS) Vendor Manual
Doc Id: 006465
Active: 02/04/08
Page 11 of 20