Original Operating Instructions
BATx0100-ES-1-400-1
Maintenance
O_BATx0100-ES-1-400-1_V3.1_GB
Page
63
of
73
7.1
Maintenance every 12 Month
NOTICE: During each maintenance interval, the following tasks must be checked.
Table 7: Maintenance in De-energized Condition (all 12 months)
MAINTENANCE TASKS
See
Section
Visual Inspection of Interior Area
Section
Torque Check of Electrical Connections
Section 7.2.3
Condition Check of Cables and Lines
Section
Section
Functional Test of DC Circuit Breaker
Section
Functional Test of AC Circuit Breaker
Section
Functional Test of Enable Switch
Section
7.2
Maintenance Task in De-energized Condition
Procedure:
1.
Perform
procedures according to Section 4.2.2.
2.
Disconnect
AC/DC voltage and supply voltage externally.
3.
Ensure
that the product is de-energized.
7.2.1 Visual Inspection of Housing
Maintenance tasks:
1.
Check
the housing for visual defects, e.g. corrosion, discolouration or
damages.
In case of visual defects,
repair
these immediately.
2.
Check
if the safety signs and type plates on the housing are damaged or
missing (Figure 4).
In case of damaged or missing labels,
contact
customer service.
7.2.2 Visual Inspection of Interior Area
Maintenance tasks:
1.
Check
the interior area for dust and water accumulation.
In case of dust and water accumulation,
remove
it from the interior area.
2.
Check
parts for discolouration or damage
.
In case of discolouration or damage,
contact
customer service.