4
Installation
Flush mounting
Iron gate
(1) (2)
(3) (4)
135.0mm
3
5
1
.
0
m
m
Wire tube
Bottom
case
3
6
3
.
0
m
m
3
8
0
.
0
m
m
φ3.5
125.0mm
96.5mm
1.
Drill holes at the suitable place on the front and the back of the door according to the size
(Figure 1).
2.Unscrew 4 screws from Gate Station.(Figure 2) .
Drill a wire hole at the bottom case, insert the transmission wires through the wiring hole,
3.
Connecting all wires and press the Gate Station from the front of the door. Fix the bottom case
with screws.
4.Fix Gate Station with screws.