5
Installation
Flush mounting
Iron gate
(1) (2)
(3) (4)
1 35.0m m
3
5
1
.
0
m
m
Wire tube
Bottom
case
3
6
3
.
0
m
m
3
8
0
.
0
m
m
φ3.5
125.0mm
96.5mm
1 .
Drill holes at the suitable place on the front and the back of the door according to the size
(Figure 1).
2.Unscrew 4 screws from Gate Station.(Figure 2) .
Drill a wire hole at the bottom case, insert the transmission wires through the wiring hole,
3 .
Connecting all wires and press the Gate Station from the front of the door. Fix the bottom case
with screws.
4.Fix Gate Station with screws.
Welcome
!
Please
input
Room
No
.
Input
room
ID “#”
f
or call
“00
#
”
for
center
INPUT ROOM ID
Welcome
!
Please
input
Room
No
.
Input
room
ID “#”
f
or call
“00
#
”
for
center
INPUT ROOM ID