Baffle installation with-out pre-punched
holes in cutter deck
1.
Remove deck covers.
2.
Raise and secure unit so cutter deck is accessible.
3.
Remove blades and scrape all grass from the under side of the deck.
4.
Align discharge-side of baffle with front outside edge of deck, and clamp. (Fig. 1)
5.
Slide trim-side up tight against front of deck, and clamp. (Fig. 2)
Note:
*
It may require two people to set and clamp baffle.
*
Install blades loosely and spin by hand to ensure there is no interference
with the baffle.
6.
Drill holes (4 or 5, depending on deck size) using a 3/8” drill bit. (Fig. 3)
7.
Secure baffle to deck using hardware provided.
8.
Tighten blade bolts and run to check for interference.
Fig. 1
Fig. 2
Fig. 3
45
Содержание WSES36
Страница 1: ...2007 Service Handbook WHAT IT MEANS TO RIDE WRIGHT ...
Страница 2: ......
Страница 4: ......
Страница 5: ...2007 Service Handbook Forms 1 ...
Страница 11: ...2007 Service Handbook Service Bulletins 7 ...
Страница 30: ...Bulletin 058 3 Pages June 29 2006 Bottom view of new routing configuration Fig 3 26 ...
Страница 37: ...2007 Service Handbook Service and Repair 33 ...
Страница 42: ...Sentar Deck alignment and pitch adjustments 16 Front Rear Raise or lower one side Pitch adjustments 38 ...
Страница 46: ...Deck Height Adjustments WS WV Hydro 2 5 3 75 3 25 4 5 1 75 3 0 3 42 ...
Страница 66: ......
Страница 67: ......
Страница 68: ...4600X Wedgewood Blvd Frederick MD 21703 www wrightmfg com ...