WQA WaterSTATION PuR100-7 Скачать руководство пользователя страница 12

10

 

PRODUCT WATER FAUCET SITE PREPARATION

 

 

Refer to Faucet Installation Instructions (Page 6) for site location and mounting hole specifications.

 

Primary considerations for site selection are convenience of use and an open area under sink.  An existing 7/8” 

Sink Hole will also accommodate metal faucets with air-gap connections.  Always check underside of selected 

location for obstructions.

 

 

PORCELAIN/ENAMEL OVER STEEL 

OR CAST IRON SINKS 

 

 

1. 

CAUTION:

  A heavy duty, variable speed drill motor  

 

with a spring-loaded porcelain drill set (Figure 6) is  

 

strongly recommended for this procedure. 

 

CAUTION:

  The plastic sleeve supplied on pilot drill  

 

(Figure 6.A) is to be positioned on drill bit against drill  

 

chuck.  This prevents chuck from contacting  

 

porcelain after pilot hole has been completed. 

 

NOTE:

  Practice on discarded sinks to familiarize  

 

yourself with operation of porcelain cutter kit. 

 

 

Using carbide tipped bit with plastic sleeve (Figure 

6.A.), drill pilot hole completely through porcelain and 

metal underneath. 

 

2. 

CAUTION:

  Avoid high motor R.P.M. during initial  

 

penetration of porcelain, as high drill speed will cause  

 

excessive chipping. 

 

Place spring-loaded porcelain saw (Figure 6.B.) into 

drill chuck.  Make sure pilot guide is inserted tightly.  

Insert pilot guide into pilot hole.  Push down gently on 

drill motor to apply light pressure to porcelain surface. 

Start drill motor turning as slowly as possible. 

 

After initial cut has started, motor speed may be 

gradually increased.  The cut may require three to 

four minutes to complete.  Going faster could result in 

excessive chipping.  Be sure a complete ring has 

been cut through porcelain to material underneath. 

 

3.  Place finish hole saw (Figure 6.C.) into drill chuck.  

Make sure pilot guide is inserted tightly.  Insert pilot 

guide into pilot hole.  Begin cut using a slow speed 

and light pressure until porcelain (inside ring cut in 

Step 2) has been penetrated to material underneath. 

 

4.  Remove saw from hole and clean all debris from 

porcelain surface.  Re-insert saw into hole and cut 

through remaining material. 

 

5.  Installation hole is ready, install faucet. 

 

 

TILE COUNTER TOP

 

 

1.  Follow procedures detailed in section labeled 

"Porcelain/Enamel Over Steel" (substitute "tile" for 

"Porcelain" in instructions). 

 

 

 

STAINLESS STEEL SINK

 

 

1.  Use a center punch to make a small indentation to 

mark center of desired location. 

 

2.  Drill a pilot hole with a 1/8" metal drill bit, then enlarge 

hole with a 9/16" metal drill bit. 

 

3.  Complete hole size by using a 1 1/4" chassis punch. 

 

4.  Installation hole is ready, install faucet. 

 

 

A.  PILOT DRILL 

 

B.  SPRING LOADED PORCELAIN SAW 

 

C.  FINISH HOLE SAW 

 

Figure 6

 

INSTALLATION STEPS CONT’D

PRODUCT WATER FAUCET SITE PREPARATION

Primary considerations for site selection are convenience of use and an open area under sink. An existing 7/8” sink 

hole will also accommodate metal faucets with air-gap connections. Always check underside of selected location for 

obstructions.

PORCELAIN/ENAMEL OVER STEEL OR CAST IRON 

SINKS

1.  

CAUTION:

 A heavy duty, variable speed drill motor with 

a spring-loaded porcelain drill set (Figure 6) is strongly 

recommended for this procedure.

   CAUTION: 

The plastic sleeve supplied on pilot drill 

(Figure 6.A) is to be positioned on drill bit against drill 

chuck. This prevents chuck from contacting porcelain 

after pilot hole has been completed.

  

NOTE:

 Practice on discarded sinks to familiarize 

yourself with operation of porcelain cutter kit.

   Using carbide tipped bit with plastic sleeve (Figure 6.A.), 

drill pilot hole completely through porcelain and metal 

underneath.

2. 

 CAUTION:

 Avoid high motor R.P.M. during initial 

penetration of porcelain, as high drill speed will cause 

excessive chipping.

   Place spring-loaded porcelain saw (Figure 6.B.) into drill 

chuck. Make sure pilot guide is inserted tightly. Insert 

pilot guide into pilot hole. Push down gently on drill 

motor to apply light pressure to porcelain surface. Start 

drill motor turning as slowly as possible.

   After initial cut has started, motor speed may be 

gradually increased. The cut may require three to 

four minutes to complete. Going faster could result in 

excessive chipping. Be sure a complete ring has been 

cut through porcelain to material underneath.

3.  Place finish hole saw (Figure 6.C.) into drill chuck. Make 

sure pilot guide is inserted tightly. Insert pilot guide 

into pilot hole. Begin cut using a slow speed and light 

pressure until porcelain (inside ring cut in Step 2) has 

been penetrated to material underneath.

4.  Remove saw from hole and clean all debris from 

porcelain surface. Re-insert saw into hole and cut 

through remaining material.

5. Installation hole is ready, install faucet.

TILE COUNTER TOP

1.  Follow procedures detailed in section labeled “Porcelain/

Enamel Over Steel” (substitute “tile” for “Porcelain” in 

instructions).

STAINLESS STEEL SINK

1.  Use a center punch to make a small indentation to mark 

center of desired location.

2.  Drill a pilot hole with a 1/8” metal drill bit, then enlarge 

hole with a 9/16” metal drill bit.

3. Complete hole size by using a 7/8” chassis punch.
4. Installation hole is ready, install faucet.

Содержание WaterSTATION PuR100-7

Страница 1: ...92673 Rev 1 11 PuR100 7 Installation Operation Service Record and Warranty...

Страница 2: ...es do the job safely and which ones don t You need an easy to recognize trusted seal approval on the products that are safe to use and will perform as advertised There is a mark that tells you at a gl...

Страница 3: ...er keep container of WaterSTATION water in the fridge to be able to enjoy the cleaner fresher taste Alternatively take it directly from the tap Ice Cubes use WaterSTATION water to fill ice cube trays...

Страница 4: ...st 4 Maintenance Requirement 5 Installation Requirements 6 Installation Steps 8 Activating the System 17 Sanitization Procedures 18 Parts List and Drawing for PuR100 7 WaterSTATION 20 WaterSTATION Flo...

Страница 5: ...from water 9 250 L 92624 Fourth Stage TFC Membrane TFC Membrane 100 TFC GPD Membrane 10 Length Reduces TDS from water 37 000 L 92625 Fifth Stage Post Filter Inline Carbon Filter 10 Micron Carbon Filt...

Страница 6: ...e check all components for any damage that may have been caused by shipping 1 WaterSTATION Module 2 Shroud 3 Storage Tank 4 First Stage Sediment Filter 5 Second Stage GAC Carbon Filter 6 Third Stage C...

Страница 7: ...nded Service Intervals Replace filters as required or based on capacity listed on page 3 depending on feed water quality Replace membrane as required based on periodic TDS rejection tests 12 Module Su...

Страница 8: ...line only Note Conditioned water is preferred since it will extend the life of your TFC membrane Drain connection is accomplished using a waste water saddle valve which is designed to fit around a sta...

Страница 9: ...water to the WaterSTATION system Drain Saddle Valve is connected to the drain to remove reject water from the WaterSTATION system Tubing supplies feed and reject water Shroud to cover the WaterSTATIO...

Страница 10: ...g a Slide nut and sleeve onto tubing in that order b Install insert into plastic tubing c Install tube with insert and sleeve into valve body d Thread compression nut onto valve body tighten 5 Turn sa...

Страница 11: ...K INSTALLATION 1 Hand tighten the ball valve onto the WaterSTATION storage tank CAUTION Do not over tighten ball valve as this may strip threads or compromise the O ring seal 2 Slide compression nut o...

Страница 12: ...ill bit 3 Complete hole size by using a 1 1 4 chassis punch 4 Installation hole is ready install faucet A PILOT DRILL B SPRING LOADED PORCELAIN SAW C FINISH HOLE SAW Figure 6 Installation STEPS CONT D...

Страница 13: ...tighten 6 Install faucet connector Apply food grade teflon tape packaged with faucet onto faucet nipple Install 3 8 white tube into faucet connector 7 Trim 3 8 white tube to desired length Install 3...

Страница 14: ...wrench provided Slide the wrench from the left hand side onto the cap 3 Hold the membrane upside down cut the plastic bag at the bottom 4 The bottom tip of the membrane must sit firmly in the protrud...

Страница 15: ...market by TO TANK sticker on the Tee of the WaterSTATION Module Cut the tube if required Route this white tubing through the hole located at the WaterSTATION bracket as shown below 3 8 Quick Connect...

Страница 16: ...ted through the hole of the bracket 4 Connect the 1 4 white tubing from the air gap barb of the faucet to the WaterSTATION Module The location of this connection is market by TO DRAIN sticker on the f...

Страница 17: ...r potable water use NOTE Before installing the ceramic filter the drain flush valve needs to be open with inlet water ON and the TFC membrane needs to be flushed for 15 minutes This will remove fines...

Страница 18: ...NG the ceramic filter is very fragile and requires gentle handling 3 Install the O ring provided with the ceramic cartridge on to the thread of the ceramic cartridge 4 Screw the ceramic filter on to t...

Страница 19: ...c filter installed 6 Let the system stand unused for 24 hours 7 Flush the system for 10 minutes CAUTION Make sure all water supply lines drain lines and fittings are secure and free from leakage 1 Ope...

Страница 20: ...bag 7 Remove filter membrane housing O rings and wash them with cleaning solution Rinse them well with clean potable water Inspect them for damage i e nicks scratches Replace damaged O rings 8 Clean...

Страница 21: ...rom cartridge and discard Replace each filter housing as each cartridge is installed 21 Turn feed water valve slowly to open position 22 Confirm system is producing water Unit will be sending rinse wa...

Страница 22: ...22 92646 2 Elbow 1 4 QC X 1 4 Stem 23 92647 1 Adapter 1 4 QC X 1 4 NPT 24 92648 3 Tee 1 4 QC Part Item Qty Description 25 92649 1 Elbow 1 4 Stem X 3 8 QC 26 92650 1 Elbow 1 4 NPT X 3 8 QC 27 92651 2 A...

Страница 23: ...21 Parts List and Drawing 8 22 32 27 70 25 24 21 15 21 36 3 9a 10 21 5 6 21 19 16 4 1 9c 9b 23 20 22 26 78 17 24 24 80 21...

Страница 24: ...ONTROL PART 92654 DRAIN LINE TUBING AIR GAP FAUCET MODELS ROUTE TUBE THROUGH FAUCET CONNECTIONS PRODUCT WATER CHECK VALVE PART 92643 MODULE INLET MEMBRANE HOUSING TFC MEMBRANE PART 92624 STAGE 4 REJEC...

Страница 25: ...n from spigot to sufficiently flush filters b Contact dealer for revised product water TDS c Replace membrane Bad tasting water a Taste from glass or plastic containers b Post carbon filter cartridge...

Страница 26: ...te MM DD YY SED CAR BLOC Installed by Customer Initials MM DD YY MEM CAR CAL CER Installed by Customer Initials Serial ______________________________________ Installation Date ________________________...

Страница 27: ...ter system of equal or greater quality You pay only freight for repaired or replaced parts from our factory and local dealer charges including but not limited to labor charges travel and transportatio...

Страница 28: ......

Отзывы: