
8
INSTALLATION STEPS
INLET SADDLE VALVE INSTALLATION ON COPPER TUBE
CAUTION: This inlet saddle valve is not designed for installation on flex line tubing.
1.
CAUTION:
If no shut off valve is installed under sink,
close main water valve during this Installation. Locate
shut off valves on water lines under sink. To identify
hot supply pipe and cold supply pipe, turn both faucets
on and let water run. As water flows, hot water pipe
becomes noticeably warmer.
2.
CAUTION:
Do not install feed water assembly on hot
water line.
Turn off cold water supply by closing shut off valve.
Drain line by opening sink faucet. Some mixing type
faucets may require hot water supply be shut off as well.
NOTE:
All instructions refer to components shown in
Figure 3 unless otherwise noted.
3.
CAUTION:
Do not turn valve handle before or while
installing saddle-tapping valve. Make sure piercing lance
does not protrude beyond rubber gasket before installing
valve.
Assemble saddle-tapping valve assembly on tube.
a. Hold back plate against tube.
• 3/8” copper tubing use back plate smaller radius.
• 1/2” copper tubing, use back plate larger radius
b. Hold valve saddle against tubing in a position directly
opposite back plate.
c. Tighten screw enough so valve saddle and back plate
are held securely against tube.
d. Rotate assembly so tubing connection is aligned
toward WaterSTATION Module feed port.
e. Tighten screw firmly. Do not crush tube.
4. Connect source water feed tubing to valve body using
compression fitting.
a. Slide nut and sleeve onto tubing (in that order).
b. Install insert into plastic tubing.
c. Install tube with insert and sleeve into valve body.
d. Thread compression nut onto valve body, tighten.
5. Turn saddle-tapping valve handle clockwise until it is
firmly seated and piercing lance is fully extended.
6.
CAUTION:
Supply line is pierced and valve is closed.
Do not open valve until system is activated. Turn on cold
water supply. Check saddle-tapping valve installation for
leaks. Allow water to run from faucet for a few minutes
to clear any debris in the line caused by installation.
NOTE:
If flow from sink faucet is reduced, clean faucet
aerator.
Figure 3:
Inlet Saddle Valve Assembly Installed on 1/2”
Copper Tubing
7. Trim ¼” white tube to desired length. Install ¼”
white tube into ¼” white collet as shown in the inter-
component connection.
ADDITIONAL POINT OF USE CONNECTION
NOTE:
Icemakers typically use 1/4” tubing as feed line. Use a reducing union for this connection.
NOTE:
Reduce the 3/8” Line to 1/4” as close as possible to the additional point-of use device to minimize flow loss.
1. To connect an additional point of use (icemaker, extra
faucet in wet bar and/or another use for treated water),
place a “tee” connector in 3/8” white line between faucet
and WaterSTATION Module.
2. Connect “tee” to point-of-use with 3/8” white tubing.
Connect tubing to point-of-use. Connector requirements
are based on type of delivery device i.e., a typical
icemaker uses 3/8” x 1/4” reducing device.
exiSTing 1/2” CoppeR Tubing
HOUSEHOLD COLD WATER LINE
SMALLER RADIUS
TIGHTENING
SCREW
REvERSIBLE
BACk PLATE
TUBING TO MODULE
(1/4” WHiTe Tubing)
vALvE BODy
1/4” QuiCk ConneCTion
vALvE HANDLE
LARGER RADIUS
STEM SEAL NUT
Содержание WaterSTATION PuR100-7
Страница 1: ...92673 Rev 1 11 PuR100 7 Installation Operation Service Record and Warranty...
Страница 28: ......