Rev 5.0/2-21
MRTA8-DC3: #35121AUS
7
1)
2A
2B
Remove all shipping materials and save them with the shipping container for future use.
2) Suspend the lifter from appropriate hoisting equipment:
2.1)
Select a crane and/or hoist rated for the Maximum Load Capacity plus the
Lifter Weight.
Note: Any lifter use must comply with all statutory or regulatory standards for hoisting
equipment in your region.
2.2) Disengage any tilt locks or latches, and raise the lift bar (figs. 2A-C).
2.3) Attach the hoisting hook to the
lift point (figs. 2D-E).
2D
2E
Make sure
hook has
restraining latch
(circled).
2F
Only use rigging rated for Maximum Load
Capacity plus Lifter Weight.
Use
rigging (fig. 2F) as needed to
make sure the hook does not
interfere with the load.
ASSEMBLY
2C
Содержание QUADRA-TILT MRTA810CDC3O
Страница 2: ...MRTA8 DC3 35121AUS Rev 5 0 2 21 2...
Страница 6: ...MRTA8 DC3 35121AUS Rev 5 0 2 21 4 Note A standard MRTA811LDC3 is shown SPECIFICATIONS...
Страница 11: ...Rev 5 0 2 21 MRTA8 DC3 35121AUS 9 TO CHANGE THE PAD FRAME CONFIGURATION ASSEMBLY...
Страница 47: ...Rev 5 0 2 21 MRTA8 DC3 35121AUS 49...
Страница 48: ...MRTA8 DC3 35121AUS Rev 5 0 2 21 50...