![Wouxun KG-UV920P-E Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/wouxun/kg-uv920p-e/kg-uv920p-e_user-manual_999375009.webp)
08
•1•Lower alignmen
•2•Cover alignment
•3•Close in the direction shown by the arrows
•4•Use the supplied screws to fasten
Front panel installation
The transceiver is supplied with two kinds of switchboard panels•Inclined switchboard panel and a flat
switchboard panel.
Install inclined switchboard panel
Self-Tapping screws
Specification: 2x16
Cover
09
Cover
Install flat switchboard panel
•1•Lower alignment
•2•Cover alignment
•3•Close in the direction
shown by arrows
•4•Use the supplied screws
to fasten
Self-Tapping screws (2)
Specification: 2x11
Front panel and main station installation
•1•Connect the cable to the transceiver' s 8 point socket.
•2•Proceed according the the arrow shown.