VENTILATION INFORMATION
BOILER LOCATION:
**The boiler can be installed under a worktop as long as:
4
The worktop above the boiler is easily removable for maintenance.
4
There is at least 10mm clearance above the boiler.
4
The front of the boiler is not enclosed.
VENTILATION:
Air vents must be functional at all times and the air supply must not be restricted or contaminated.
The boiler clearances must meet the minimum shown below for servicing and venting purposes.
* If this clearance is less than 75mm the flue 'knock-out' panel sections must be removed to improve air
circulation and cooling.
Do not place clothes or objects to hinder the air circulation required by the boiler.
VENTILATION INFORMATION
GREENSTAR HEATSLAVE II 12/18, 18/25 & 25/32
6 720 805 211a (07.2013)
13
GENER
A
L
INF
O
RM
A
T
IO
N
Содержание GREENSTAR HEATSLAVE II SERIES
Страница 21: ...19 NOTES NOTES GREENSTAR HEATSLAVE II 12 18 18 25 25 32 6 720 805 211a 07 2013 NOTES ...
Страница 22: ...NOTES GREENSTAR HEATSLAVE II 12 18 18 25 25 32 6 720 805 211a 07 2013 20 NOTES NOTES ...
Страница 23: ...21 NOTES NOTES GREENSTAR HEATSLAVE II 12 18 18 25 25 32 6 720 805 211a 07 2013 NOTES ...