9
U
SIN
G
Y
O
UR
BOI
L
E
R
OPERATING THE BOILER
SYSTEM PRESSURE:
This boiler is fitted to a sealed heating system which is pre-pressurised. Your installer will advise you
of the minimum and maximum pressure indicated on the pressure gauge.
4
Check regularly that the pressure is maintained.
Optimum system pressure when your boiler is cold
(area A) and the pump is off. The indicated
pressure will change as the pump switches on, for
more accurate readings check pressure when the
pump is not running.
4
Contact your installer or maintenance engineer if
a permanent significant decrease or increase in
pressure is indicated on the pressure gauge.
FILLING LOOP:
If the sealed system pressure within your system drops to below 0.5 bar (shown on the pressure
gauge) you will need to increase the pressure to ensure your boiler continues to run without
problems.
Your installer should have informed you where to find the filling system and instructed
you in its use.
Once the external filling loop has been located, follow the instructions for re-pressurising the
system.
GREENSTAR HEATSLAVE II 12/18, 18/25 & 25/32
6 720 805 211a (07.2013)
OPERATING THE BOILER
1. Unscrew blanking cap.
2. Attach the hose to the valves,
screw on hand-tight.
3. Turn the handle/screwdriver slot
through 90° to open valves.
4. The handle/screwdriver slot will
be in line with the valves.
5. When the pressure reaches
between the 1 and 1.5 bar marks
(zone A), turn the
handle/screwdriver slot back,
through 90°, to close the valve.
6. The handle/screwdriver slot will
be at 90° to the valves.
7. Remove the hose and replace
the blanking caps.
Содержание GREENSTAR HEATSLAVE II SERIES
Страница 21: ...19 NOTES NOTES GREENSTAR HEATSLAVE II 12 18 18 25 25 32 6 720 805 211a 07 2013 NOTES ...
Страница 22: ...NOTES GREENSTAR HEATSLAVE II 12 18 18 25 25 32 6 720 805 211a 07 2013 20 NOTES NOTES ...
Страница 23: ...21 NOTES NOTES GREENSTAR HEATSLAVE II 12 18 18 25 25 32 6 720 805 211a 07 2013 NOTES ...