background image

13

Fault or breakdown

Greenstar FS CDi 

ErP

– 6720818078 (2015/12)

7

Fault or breakdown

This boiler is supported in the UK and Eire by Worcester, Bosch 
Group.

Specialist service engineers are available to attend a 
breakdown occurring on this boiler.

No charge will be made for parts and/or labour providing:
A boiler fault is found and the boiler is within the guarantee 
period. Reasonable evidence of this must be supplied on 
request. i.e. the Benchmark Checklist.

A call-out charge will be made where:
– The boiler is outside the guarantee period.
– Evidence cannot be provided that the annual service 

inspections have been carried out (i.e. entries in the 
Benchmark Checklist).

– Our Field Service Engineer finds no fault with the 

boiler.

– The cause of breakdown is misuse or with other parts of 

your plumbing/heating system, or with equipment not 
supplied by Worcester, Bosch Group.

Technical Support

In the event of a boiler fault or breakdown please contact 
Worcester, Bosch Group appointments team (see back cover 
for details). 
Your advisor will arrange for an engineer to call with the 
minimum of delay.

8

Environment / disposal

Environmental protection is a fundamental corporate strategy 
of the Bosch Group. 
The quality of our products, their economy and environmental 
safety are all of equal importance to us and all environmental 
protection legislation and regulations are strictly observed.
We use the best possible technology and materials for 
protecting the environment taking account of economic 
considerations.

Packaging

We participate in the recycling programmes of the countries in 
which our products are sold to ensure optimum recycling. 
All of our packaging materials are environmentally compatible 
and can be recycled.

9

Tips on energy saving

Heating economically

The boiler provides a high level of comfort whilst keeping gas 
consumption low and so minimising the environmental impact.
The gas supply to the boiler‘s burner is regulated according to 
the demand for heat. The boiler operates with a low flame if the 
demand for heat reduces. The technical term for this process is 
modulating control.
Modulating control reduces temperature fluctuations and 
provides an even distribution of heat throughout the home. 
This means that the boiler may stay on for relatively long 
periods of time but will use less gas than a boiler that 
continually switches on and off.

Central heating systems with room thermostat/
thermostatic radiator valves

With modern heating systems designed around a 20 °C heat 
loss across the system, the optimum setting for a condensing 
boiler will be approximately between the first and second 
segment on the central heating temperature control. The 
system must be balanced correctly and the radiators may need 
upgrading. 
The temperature of each room can be set individually (except 
primary room with the room thermostat) using the 
thermostatic radiator valves.

Invoices for attendance and repair work 
carried out on this boiler by any third party will 
not be accepted.

No boiler fault is found on over 30% of all 
service calls.

In the case of a suspected fault, refer to the 
fault finding section of this guide.

USED APPLIANCES

▶ Greenstar gas boilers are 100% recyclable.

The various assemblies can be easily 
dismantled and synthetic materials are 
marked accordingly. 
Assemblies can therefore be sorted by 
composition and passed on for recycling.

Содержание Greenstar FS 30CDi ErP

Страница 1: ...EALED OR OPEN VENT CENTRAL HEATING SYSTEMS 6 720 818 078 2015 12 The appliances are for use with Natural Gas or L P G Cat II 2H3P type C13 C33 C53 C93 Natural Gas FS 30CDi ErP Regular GC number 41 406...

Страница 2: ...y efficient offering you economical running costs and value for money It sits in SEDBUK 2005 Band A scoring highly in SEDBUK 2009 and is therefore among the top energy rated boilers available There is...

Страница 3: ...ved Children shall not play with the appliance Cleaning and user maintenance shall not be made by children without supervision Combustible and Corrosive Materials Chemically aggressive substances can...

Страница 4: ...etedbytheinstalleratthetimeofinstallation Itconfirms that the boiler hasbeen installed and commissioned according to the manufacturer s instructions The logbook provides space for the recording of reg...

Страница 5: ...oiler controls Boiler Controls 1 Master switch for ON OFF 6 Not used 2 Power ON and fault indicator blue 7 Central heating temperature control 3 Boiler display 8 Service Engineer button only 4 Reset b...

Страница 6: ...0 Fig 3 Settings for the central heating temperature with approximate temperatures 3 2 1 Controlling the central heating Central heating systems must be controlled effectively using a programmer or ti...

Страница 7: ...protection Leave master switch on 1 Turn the central heating temperature control 7 to frost protection 3 3 1 Frost protection for the heating system If remote pipe work is likely to be subject to free...

Страница 8: ...ndicator 2 will stop flashing The boiler will function normally dependent on programmer and room thermostat settings 6720808851 05 1Wo 1 2 3 4 5 6 max reset eco 3 2 4 If the fault cannot be cleared by...

Страница 9: ...ce with the addition of cupboards shelves etc next to the boiler item Minimum distance requirements for compartments 1 Overall height of compartment 2 Overall depth of compartment 3 Overall width of c...

Страница 10: ...unventilated compartment or an airing cupboard then ventilation must be provided as described in BS 5440 A minimum of two air vents of equal size must be fitted one at low level and another at high l...

Страница 11: ...yed then it will be necessary to contact the Worcester Bosch Group This table gives information on basic operating system problems Problem Cause Remedy EA fault code flashing on display No gas supply...

Страница 12: ...up Appointments Team see back cover for details Contact your installer in order to find a permanent solution to the problem When calling Worcester Bosch Group you may be asked for the error code This...

Страница 13: ...which our products are sold to ensure optimum recycling All of our packaging materials are environmentally compatible and can be recycled 9 Tips on energy saving Heating economically The boiler provid...

Страница 14: ...f this boiler is fitted to a sealed system and water leaks are found or if excessive bleeding is required then a service engineer must be contacted to inspect the installation and rectify any fault On...

Страница 15: ...ed by faulty installation neglect misuse or accidental damage or the non observance of the instructions contained in the Installation and Users Instructions leaflets viii that the appliance has been u...

Страница 16: ...9 SPARES 0330 123 9779 LITERATURE 0330 123 9119 TRAINING 0330 123 0166 SALES 0330 123 9669 Worcester Bosch Group Cotswold Way Warndon Worcester WR4 9SW Tel 0330 123 9559 Worcester Bosch Group is a bra...

Отзывы: