19
3.10.1 DETERMINE THE PLUME MANAGEMENT SYSTEM LENGTH
Fig. 19 Effective lengths L and M
Fig. 20 Effective flue lengths versus plume management lengths
[Min] Minimum plume kit length 500mm
[M]
Plume management length allowed (mm)
[L]
Effective flue length (mm)
[1]
28, 32 & 36CDi Compact data line
[2]
Maximum plume length for all boilers
Refer to figure 20 to determine the appropriate plume length (M) versus
the flue length (L).
The lengths for both plume and flue are the effective lengths, which
includes the effective length of any bends plus the straight lengths.
The graph can be used to calculate:
•
Effective flue length
if a specific effective plume length is required.
•
Effective plume length
if a specific effective flue length is required.
4
INSTALLATION
4.1
UNPACKING WALL FRAME & ANCILLARY ITEMS
▶ Remove the retaining straps from the carton.
▶ Open the four carton flaps and unpack as follows:
1. Remove items 1 to 6 from the cardboard tray.
2. Remove the wall mounting frame and cardboard tray together.
Fig. 21 Unpacking
[1]
Wall mounting frame
[2]
Bottom panel
[3]
Literature pack with wall mounting template
[4]
Integral Filling Loop kit
[5]
Front fascia panel
[6]
PRV installer connection elbow
IMPORTANT HANDLING INSTRUCTIONS:
• It is advised that two people are used to carry the carton from the van
to the point of delivery.
• Once the carton has been delivered, the outer carton is removed first.
Care should be taken when releasing the straps. If a sharp implement
Effective straight flue length for telescopic flue with plume
management
Minimum plume length
500mm (M)
Maximum plume length
5,000mm (M)
Maximum flue length
5,000mm (L)
Maximum flue length
2,200mm (L)
Table 9
Note:
▶ Measurement M must be a minimum of 500mm and
must not exceed 4,500mm for a 60mm plume
management system used with the horizontal Ø 60/
100mm flue.
6720803800-09.1Wo
M
L
0
500
1,500
2,500
3,500
4,500
1,000 2,000 3,000 4,000 5,000 6,000
Min
L
M
6720803800-08.1Wo
1
2
WARNING:
All the previous “Pre-Installation” sections
must be read and the requirements met before starting
boiler or flue installation.
CAUTION:
LIFTING AND CARRYING
▶ Only lift a manageable weight, or ask for help.
▶ Bend your knees and keep your back straight with feet
apart, when lifting or putting down heavy objects.
▶ DO NOT lift and twist at the same time.
▶ Lift and carry object close to the body.
1.
1
6
2
3
4
5
2.
6720646608-07.2W
o