PRE-INSTALLATION
6 720 803 599 (2012/06)
14
SERVICING CLEARANCES
COMPARTMENTS
Follow the requirements of BS6798 and BS5440 Part 2 and note:
•
Minimum clearances must be maintained.
•
An access door is required to install, service and maintain the boiler
and any ancillary equipment.
•
If fitting the boiler into an airing cupboard use a non-combustible
material to separate the boiler from the airing space.
The material can be perforated up to a maximum hole size of 13mm.
BATHROOMS:
A boiler fitted with a non-mechanical timer or with no timer can be
installed in zone 2 or outside the shaded area .
A boiler with a mechanical timer or RF mechanical timer with room
thermostat must only be installed outside the shaded area.
Additional RCD (Residual Current Device) protection may be required.
Refer to the latest IEE wiring regulations.
BATHROOM INSTALLATIONS
Fig. 17 Bathroom installations
*
Minimum clearance to removable door
**
Minimum clearance required for servicing
***
Height for either 60/100 flue or 80/125 flue
Table 8 Minimum clearances
1
1
30/1
170mm***
960mm
380mm
450mm
170/210mm***
600mm**
5mm
5mm
200mm
20mm*
6720803599-10.1W
o
NOTICE: Any switch or appliance control using 230 V
mains electricity must not be able to be touched by a
person using the bath or shower.
Electrical switches, fused spur and socket outlets
must not be situated in the bathroom.
6720646608-124.1Wo
Radius 600mm
Radius
600mm
2
1
2
2
2
1
2
2
600mm
2
1
2
600mm
600mm
600mm
750mm
2250mm
2250mm
Radius 600mm
Radius
600mm
2
1
2
2
2
1
2
2
2
1
600mm
600mm
600mm
750mm
2250mm
2250mm
2