36
Dealer Service
MAN0577 (6/29/2007)
Figure 21
. Crossbar Timing - Bottom View
Crossbar Timing
Crossbar must be re-timed anytime a crossbar or a
side drive is disconnected.
1.
To re-time crossbars, position bars as shown in
Figure 21.
2.
The center crossbar will be at right angles to the
front of the cutter.
3.
The left and right crossbars should be
perpendicular to the center crossbar.
4.
Hold crossbars in position while connecting the
side drivelines.
UNIVERSAL JOINT REPAIR
Figure 22
. Universal Joint Exploded View
U-Joint Disassembly
1.
Remove external snap rings from yokes in four
locations as shown in Figure 23.
Figure 23
. Remove Snap Ring
Figure 24
. Remove Cups
2.
With snap rings removed, support drive in vise,
hold yoke in hand and tap on yoke to drive cup up
out of yoke. See Figure 24.
1. Yoke
2. Cup and bearing
3. Snap ring
4. Journal cross
(Rev. 5/17/2012)
Содержание TS1680
Страница 1: ...OPERATOR S MANUAL ROTARY CUTTER MAN0577 Rev 9 30 2015 TS1680 TS1680Q...
Страница 28: ...28 Troubleshooting MAN0577 6 29 2007 NOTES...
Страница 41: ...Assembly 41 MAN0577 6 26 2007 Figure 29 TS1680 Pull Type Cutter Assembly Front Half...
Страница 47: ...Assembly 47 MAN0577 6 26 2007 Figure 35 Stationary Blade Positions for 1000 RPM and 540 RPM Models...
Страница 52: ...52 Parts MAN0577 6 29 2007 PULL TYPE ASSEMBLY FRONT HALF...
Страница 56: ...56 Parts MAN0577 6 29 2007 MOUNTED CUTTER ASSEMBLY Rev 1 25 2008...
Страница 58: ...58 Parts MAN0577 6 29 2007 CENTER GEARBOX ASSEMBLY...
Страница 60: ...60 Parts MAN0577 6 29 2007 SIDE GEARBOX ASSEMBLY...
Страница 70: ...70 Parts MAN0577 6 29 2007 CASTER ARM ASSEMBLY MOUNTED...