background image

3

1. Prepare Building Parts and Details

•  Remove mold flash from Wall and Roof Sections and Details 

using a hobby knife and sandpaper (Fig. 1a). Do not remove 

Details from sprues at this time.

•  Wash Wall Sections, Roof and Details in warm, soapy water 

using a mild detergent. Rinse and let dry. 

•  Details can be left on sprues (recommended) or 

removed for priming and painting. Remove using 

a hobby knife (or flush cutting shears) and sand 

off parting lines (Fig. 1b). Details may be easier to 

paint on sprue. It also makes identifying them easier 

during assembly.

•  Be careful to not remove placement posts or 

installation tabs (Fig. 1c).

2. Prime and Paint

Do not prime or paint placement posts.
•  Apply a thin coat of primer and let dry.
•  Paint as desired and let dry. See Tips & Techniques 

on pg. 6 for painting tips and weathering 

techniques.   

TIP! To make priming and painting loose 

Details easier, secure them to strips of 

masking tape attached (sticky side up) to 

a piece of cardboard (Fig. 2a and 2b).

3. Install Window Material

Position Printed Window Material on 

backside of Walls. Remove protective film 

before installation. If clear windows are 

preferred, use Clear Window Material. 
•  Align Window Material over 

corresponding windows on inside of 

Building. Verify placement, then glue 

in place. Dab a small amount of glue 

carefully around edges (Fig. 3a)

•  Repeat for each set of window openings.

4. Apply Dry Transfer Decals

•  Cut out desired Decal. Avoid handling the back and position in desired location. Rub over 

entire Decal with a burnisher or dull pencil.

•  Lift away carrier sheet carefully. If Decal did not transfer completely, let carrier sheet fall 

back in place and burnish again.

•  Place backing paper over Decal and burnish again for maximum adhesion.
•  When applying onto textured surface, press Decal into texture with a pencil eraser.

Fig. 1a

Fig. 3a

Four void pieces, 

please disregard!

Fig. 1b

Fig. 1c

Placement Post

Fig. 2b

Fig. 2a

Содержание LANDMARK STRUCTURES FIRE STATION N 3

Страница 1: ...and contact the Woodland Scenics Sales and Customer Service Department at PO Box 98 Linn Creek MO 65052 573 346 5555 or sales woodlandscenics com XPF5212INST G4 2014 O CO 1 160 BUILDING KIT FIRE STAT...

Страница 2: ...per Building Kit Contents Building Footprint 3 19 32 in W x 3 7 32 in D x 4 13 16 in H 9 11 cm x 8 17 cm x 12 2 cm Four void pieces please disregard Four void pieces please disregard Four void pieces...

Страница 3: ...ler Scissors Newspaper Read through instructions booklet Collect additional supplies Check kit contents and verify Details Cover project area with newspaper Before You Begin NOTE Allow glue to set bef...

Страница 4: ...iming and painting loose Details easier secure them to strips of masking tape attached sticky side up to a piece of cardboard Fig 2a and 2b 3 Install Window Material Position Printed Window Material o...

Страница 5: ...o groove and on top of hinge pins then glue in place Install second set Doors in the same manner Fig 5c 7 Attach Tower Assembly Insert Tower Assembly into cutout in Front Wall at a slight angle Fig 7a...

Страница 6: ...ontinue by installing Chimney Back 15 onto left rear chimney Chimney Back 16 onto right front chimney and Chimney Back 17 onto right rear chimney Fig 9a 10 Complete Tower Assembly Glue Upper Tower par...

Страница 7: ...eathering Techniques Mortar Wash Create the look of brick mortar or add a weathered look formula follows Lay building flat so wash spreads evenly Using a paintbrush dab on small amounts of Mortar Wash...

Страница 8: ...rket PF5200 Main Street Mercantile PF5202 Planters Feed and Seed Supply PF5201 Sicken Tire Company PF5204 County Courthouse PF5209 Rustic Barn PF5211 Country Cottage PF5206 O Leary Dairy Distribution...

Отзывы: