![Woodland Mills HM130MAX Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/woodland-mills/hm130max/hm130max_operators-manual_995004017.webp)
HM130MAX Operator’s Manual
3. TRACK
Assemble the track system with the provided components and hardware listed in the table
below. It is important to assemble and level the track on a firm foundation before tightening all
of the hardware and it should ideally be a minimum of 4 in [100 mm] off the ground. This will
allow for easy cleanup of sawdust from under the tracks and height adjustment of the log
supports.
* Centre bunk incorporates four (4) mounting holes at each end
16x
M10 X 35 mm
Flanged Hex
Bolt
4x
Track Rail
28x
M10 X 25 mm
Flanged Hex
Bolt
2x
Reinforcement
Plate
40x
M10 Flanged
Lock Nut
4x
Carriage Stop
12x
Track Foot
2x
End Bunk
2x
Mid Bunk
1x
Centre Bunk*
HM130MAX-MY2020: Rev B
Page
of
15
92
04-Dec-2019
If a Woodland Mills sawmill trailer was
purchased with this sawmill, skip this track
assembly section and follow the track
assembly instructions in those manuals.
Содержание HM130MAX
Страница 2: ...This page intentionally left blank...
Страница 93: ...HM130MAX Operator s Manual NOTES HM130MAX MY2020 Rev B Page of 91 92 04 Dec 2019...
Страница 94: ...HM130MAX Operator s Manual HM130MAX MY2020 Rev B Page of 92 92 04 Dec 2019...
Страница 95: ...This page intentionally left blank...
Страница 96: ......