OPERATION
Transfer Deck Setup
MHdoc070512
2-2
2
Have a qualified electrician install the power supply (in accordance with EN
60204 Standard). The power supply must meet the specifications given in the
table below.
IMPORTANT!
When starting the unit for the first time,
check that the chain rotation direction is correct. If it is
incorrect, invert the phases in the phase inverter located in
the power socket (in the electric box).
IMPORTANT!
When starting the equipment for the first
time, let it run for the first 1-2 hours without load.
The transfer deck can be lifted with a forklift only. The forklift should be rated for at least
1000-1500kg depending on the transfer deck length. The transfer deck is equipped with
3-Phase
Volts
Fuse Disconnect
Recommended Wire
Size
400 VAC
4 A
1.5 mm
2
TABELA 2-0
Operator’s
Position
!
!