![Wood-mizer LT40DC Series Скачать руководство пользователя страница 61](http://html.mh-extra.com/html/wood-mizer/lt40dc-series/lt40dc-series_user-manual_994653061.webp)
Setup & Operation
Preparing The Sawmill For Towing
Setup & Operation
30Sdoc120507
2-34
2
8.
Hook the carriage safety chain located at the bottom of the carriage to the bracket at the
bottom of the mast.
See Figure 2-18.
9.
Store the loading ramps on the bed rails. Secure to the bed with the two retaining brack-
ets.
CAUTION!
Check to be sure the saw head safety chain is
secured before towing the sawmill. Failure to properly
secure the saw head can result in severe machine damage.
Be sure the blade housing and pulley covers are in place
and secure. Use the safety retainer pin and cable to fasten
blade housing covers.
10.
Remove all loose objects from the bed of the mill. Store the outrigger jack handle in the
bracket provided on the rear/loading-side outrigger guide. Reel in the winch cable.
Remove the winch handle.
11.
Place both fenders in the slots located behind the trailer tires and secure with retaining
pins. Raise all but the very front outrigger.
See the trailer operator’s manual for specific information regarding hitch operation and
towing the sawmill.
FIG. 2-18