Setup & Operation
Stationary Sawmill Setup
Setup & Operation
2596doc091809
2-1
2
SECTION 2 SETUP & OPERATION
2.1
Stationary Sawmill Setup
See Figure 2-1.
Set up the mill on firm footing. Level by eye. Fasten the mill to the floor to
prevent any creep after prolonged use.
NOTE:
Make sure the unit is level before securing. It IS possible to twist the mill frame by
jacking one foot higher than the others.
FIG. 2-1
Содержание 1996 LT25
Страница 6: ......
Страница 19: ......
Страница 20: ...Safety General Information Components 1 1 12 2596doc091809 Safety General Information...
Страница 50: ...Setup Operation Preparing The Sawmill For Towing 2 2 30 2596doc091809 Setup Operation...
Страница 64: ......
Страница 66: ......
Страница 76: ......