4.2. PREPARING THE BASE
Careful planning at an early stage will greatly help the installation process and make sure that all
the required clearances are adhered to for servicing and that any potential issues with the routing
of the flue can be resolved.
The ECOMPACT pellet boiler should be positioned on a concrete plinth at least 50mm high and
should project a min. 100mm beyond the sides and the rear of the appliance and at least 600mm
to the front. The plinth must be capable of supporting the weight of the appliance when full with
fuel and the plumbing system has been filled with water.
Use the template below for constructing the plinth and for positioning the flow and return
pipework and electrical supply.
Flow Pipe
Return Pipe
Electrical
Supply
Carefully position
boiler over pipes.
ECOMPACT 15
Page 13
Installation & Assembly
© Wood Energy Solutions
woodenergysolutions.ie
Refer to service and access clearances around the appliance on Page 8
Содержание E-COMPACT 15
Страница 1: ...Installation Operation Manual E COMPACT 15 Outdoor Pellet Boiler woodenergysolutions ie V 1 4 02 12 ...
Страница 19: ...Control System ECOMPACT 15 Page 18 5 CONTROL SYSTEM Wood Energy Solutions woodenergysolutions ie ...
Страница 20: ...ECOMPACT 15 Page 19 Control System Wood Energy Solutions woodenergysolutions ie ...