
Pro Island Hood Installation
10
DUCT COVER INSTALLATION
1)
Use the four
1
/
4
" x 3" (76) lag screws and washers
(provided with hood) to attach the duct cover to ceiling
framing. The width of the duct cover should be the
same as the top plate of the island hood. Refer to the
illustration and chart on page 7.
2)
Install additional #10 x 2" (51) hex head screws
(provided with hood) along the top edge of the duct
cover for support. Refer to the illustration below.
3)
Proceed with hood preparation and installation.
DUCT
COVER
LAG
SCREWS
HEX HEAD
SCREWS
Duct cover installation.
Duct Cover
IMPORTANT NOTE:
If an optional duct cover is to be used
with the pro island hood, it must be attached before
installing the hood.
Installing a duct cover will impact all aspects of the
hood installation, including hood location, ducting,
electrical placement and the mounting surface.