6
Gigant
Caution
Installation information
Foundation /
Base frame
Insulation
strips on site
x = unit width - 30mm
KGW:
To avoid the transfer of structure-borne sound from the air-conditioning
unit to the building, a permanently elastic intermediate layer must be
provided between the installation surface or foundation and the air-
conditioning unit. This intermediate layer should preferably consist of
insulation strips fitted along the frame profiles of the unit.
KGW: For the installation and assembly of the units and unit components a
base frame or foundation base is required.
The unit may not be placed on level ground as this would damage the
throating (see illustration). To avoid any damage, the unit may, if
necessary, placed on timber strips.
Base frames must be horizontally aligned and the foundation base must be level
and horizontal.
The whole underside of the equipment frame must be in contact with the supporting
surface; gaps underneath the frame are not permissible.
Timber strip
WOLF base frames are supplied either pre-fitted to the unit or as separate
modules (shipped in advance).
Separately supplied base frames are supplied as individual sections and must
be assembled, aligned and fixed to the installation surface on site, according
to the instructions supplied with the base frame.
For units pre-fitted with base frames but supplied in sections, the base frame
sections correspond with the relevant unit sections.
KGW: The insulation of the base frame and its integration into the roof sealing
layer must be carried out on site. For base frames supplied in advance,
it is recommended to install the insulation on the inside of the base
frame, as this makes the integration into the roof sealing layer
considerably easier.
Washer
Screw
Cinnecting
bracket
Bolt
Drip edge
Base frame
When positioning on the base frame or the foundation base, the units
must be aligned in such a way that a gap of approx. 15 mm between
the base frame or foundation base and the throating remains on all
sides.
After the completion of the assembly, the air-conditioning units must
be secured to the base frame foundation base with the brackets
supplied.
Insulation
strips on site
Insulation
Sealing
Insulation strips on site
KG:
Grundrahmen
vorab geliefert
Grundrahmen
angebaut
KG:
For the assembly and installation of the units and unit components, a
level and horizontal floor, with the right load-bearing capacity, is
required.
Base frames must be horizontally aligned, foundation bases must be
level and horizontal.
The whole underside of the equipment frame must be in contact with
the supporting surface; gaps underneath the frame are not permissible.