Supplementary installation instructions for balanced flue DN80/125
As a rule, install the adaptor from balanced flue gas routing
DN60/100 to DN80/125 (2)
vertically and always on the
flue outlet of the gas condensing boiler.
Adaptor from balanced flue
DN60/100 to DN80/125
Inspection piece (3)
Determine distance A. Length of balanced flue (4) always approx.
100 mm longer than distance A. Always trim the flue pipe on the
smooth side,
never
on the female connection side.
Chamfer the flue with a file after trimming.
4
9
9
Distance A
Offset
11
10
11
11
4
4
Distance A
Distance A
Flat roof:
Affix ceiling outlet (14), approx. Ø 130 mm, to the
roof cover.
Pitched roof: For (12), observe the installation instructions on the
cowl regarding roof pitches.
If an inspection aperture is required for the balanced flue, insert a
balanced flue with inspection aperture (3) (200 mm length).
Insert roof outlet (7) into the roof from above and secure vertically
with (6) to a rafter or brickwork.
Install the roof outlet only in its original condition. Modifications
are not permissible.
When installing, slide the separator (8) fully into the female
connection. Push the subsequent balanced flue (4) 50 mm
(dim. "S") into the
female connection
of the separator and
always secure in this
position, e.g. with
pipe clips DN125
(5) or with a locking
screw on the air side.
* Observe the installation instructions for polypropylene
(PP) flue systems.
Secure support bend (23)
on the support rail (22)
15
16
220
>400
12
13
6
14
7
650
550-1050
1250
1750-2300
Bend
Offset
87 °
min. 205 mm
45 °
min. 93 mm
31. Technical information, balanced flue