Gas Range Installation
16
Oven Door Removal
OVEN DOOR REINSTALLATION
1)
Hold the oven door on both sides and position it with
door hinges aligned with openings in the oven frame.
2)
Holding the oven door at an approximate 30° angle
from vertical, slide the hinges into the openings
until the bottom hinge arms drop fully into the hinge
receptacles.
3)
Open the oven door to its fully opened position.
Remove the hinge pin from the appropriate hinge arm.
Refer to the illustration below.
4)
Reinstall the hinge retainer plate with upper and lower
mounting screws.
5)
Open and close the door completely to ensure that it is
properly installed.
6)
Reinstall the lower kickplate assembly.
Gas Supply Connection
IMPORTANT NOTE:
All connections to the gas piping must
be wrench-tightened. Do not make connections too tight,
this may crack the regulator and cause a gas leak. Do not
allow the pipes to turn when tightening fittings.
Assemble the flexible metal connector from the gas supply
pipe to the gas pressure regulator. Determine the fittings
required depending on the size of your gas supply line,
flexible metal connector and shut-off valve. Refer to the
illustration below. If a flexible metal connector is used, be
sure the tubing is not kinked. Open the shut-off valve in
the gas supply line. Wait a few minutes for the gas to
move through the line.
GAS LEAK TESTING
Brush a liquid detergent solution onto all gas connections
to test for leaks. Bubbles around connections will indicate
a gas leak. If a leak appears, close the gas shut-off valve
and adjust connections. Check for leaks again. Clean off
the detergent solution.
Never test for a gas leak with a match or other flame.
FLEXIBLE
METAL CONNECTOR
GAS PRESSURE
REGULATOR
SHUT-OFF
VALVE
ELBOW
ADAPTER
ADAPTER
NIPPLE
Gas supply line connection.
Before connecting the gas supply, make sure all valves
are in a closed position.