Operating manual GMV-B
Page 20 of 28
B0823
b) Venting of the cartridge reservoir
As for bleeding the cartridge / container, loosen the bleeding plug screw and wait until the
medium emerges without bubbles from the bleeding bore.
c) Venting of the unit
Vent both the line and unit to get the unit working satisfactorily. For that purpose, actuate
the drive assembly as many times as necessary to have the lubricant emerging at the outlet
without air bubbles.
b) Venting of the line feeding the lubricating point
Make sure that the line feeding the lubricating point has been cleaned and
enables free flow!
Link the line feeding to the lubricating point with the unit, actuate the unit as many times as
necessary to have the lubricant emerging from the line without air bubbles. This action can
be shortened when the tube ascends towards the outlet.
6.6 Putting out of operation
The unit is put out of operation by switching-off and deinstalling from the external power
supply.
Skilled electricians are the only ones allowed to intervene in electrical
installations according to DIN VDE 1000-10.
Vent screw