
Operating manual GFZ / GFM / GEZ
Page 22 of 30
B0112
8.3 Inspection schedule
No.
Description
Interval
1
Check the presence and functionality of the safety
facilities.
Daily
2
Check the lube lines and connections for
mechanical integrity and leakage.
Monthly
3
Check the pump units and components for
mechanical integrity and leakage.
Weekly
4
Check the filling level of the pump unit.
Weekly
8.4 Repair
Exchange of motor
Warning!
Only use motors which are appropiate for pump units.
The permissable technical details and necessary dimensions
can be seen in the attachment.
Models GFZ-B until GFZ-D, GFM-F and GFM-G; GEZ-B and GEZ-C, PFZ-B until PFZ-D,
PFM-F, PFM-G, PEZ-B and PEZ-C
The gear pumps PFZ-B until PFZ-D and PFM-F and PFM-G and PEZ-B and PEZ-C are
supplied without motor, with connection flange and coupling.
All servicing and repair work on the electric facilities may only be done by
skilled electricians in accordance with DIN VDE 1000-10.