
Operation manual GMK-A
Page 31 of 35
B0887
8.3 Inspection schedule
Nr.
Description
Interval
1
Check the presence and functionality of the safety
facilities.
daily
2
Check the lube lines and connections for mechani-
cal integrity and leakage.
monthly
3
Check the units and components for mechanical
integrity and leakage.
weekly
4
Check the filling level of the pump unit.
weekly
8.4 Repair
For repairs, turn to WOERNER, please.
8.5 Accessories
Designation
Order-no.
Use for
Mounting plate
112.620-65
Screw connection with M6 from the front instead
of screw connection with M5 from the rear
Screw plug
with sealing ring
206.674-65
Closing unused outlets
Straight push-in
fitting ø4
943.600-61
Polyamide tubes or hoses
with connectors with claw groove
Straight push-in
fitting ø6
943.600-48
Polyamide tubes or hoses
with connectors with claw groove
Locking coupling
G1/8a
954.004-07
Filling via the optional sealing nipple
Suction and pressure
syringe with hose
and plug nipple
511.200-65
Filling of oil via the optional locking coupling
Y-connector ø6
943.601-36
Combining separate outlets with hose- ø6
Cable socket
M12x1, 5-pin
length 5 m
913.405-76
Connection of the unit for power supply
and signal transmission of function control
and level control
Cable socket
M8x1, 3-pin
straight, length 5 m
913.405-77
Connection of level control for reservoir 04
or reservoir 05 (also possible for reservoir 40)
Cable socket
M8x1, 3-pin
90°, length 5 m
913.405-79
Connection of level control for reservoir 40
(also possible for reservoir 04 or 05)