Subject to changes without notice!
Gearless Synchronous Lift Machines
WSG-10
Operating and Maintenance Manual
Page 20
Date 11.29.2016
Version A
Code J40069
12.3 Lubricating instructions
12.4 Brake remote release for MRL solution
After working 7,000 hours need to inject grease for
lubricating bearing again. the details operating steps
as follows:
1. See the picture, tighten up part 1 clockwise;
2. Use the gun inject grease from oil gilb into brearing
Glib:
GB/T7940.1-AM10X1
Injection flow:
80g
Grease type:
Timken GR217
A brake remote release system would be required
when it is a MRL solution. Besides the standard
brake, the system additionally consists of cam
mechanism(1), dragline subgroup(2) and operation
mechanism(3).
Grease nipple
Note
1. As less bending as possible for dragline
to reduce the friction between dragline
and spool.
2. Radius of curvature ≥200mm at the area
of bending.
3. Place the system in an area where is easy
for operation. Either horizontal or vertical
installation is acceptable.
Содержание WSG-10
Страница 32: ......