
4.8 Night Light or Chart Light Bulb
Chapter 4: Removal, Replacement, and Adjustment Procedures
4.8 Night Light or Chart Light Bulb
Tools required:
Phillips head screwdriver
Removal
SHOCK HAZARD:
Locate the involved building standard or emergency circuit breaker
panel. Set the involved circuit breaker to OFF. Lock out and tag out the
breaker. Failure to follow this procedure could cause serious personal
injury and damage to the equipment.
1. Set the involved circuit breaker (A) to OFF (see figure 4-1 on page 4-3).
2. Lock out and tag out the circuit breaker.
3. Using the phillips head screwdriver, remove the screws (D) and the chart or
night light faceplate (E) from the raceway (F) (see figure 4-9 on page
4-20).
4
Integris® 2002 Headwall System Service Manual (man142rb)
Page 4 - 19
Содержание Integris 2002
Страница 2: ......
Страница 6: ...Revisions NOTES Page iv Integris 2002 Headwall System Service Manual man142rb...
Страница 16: ...Table of Contents NOTES Page xiv Integris 2002 Headwall System Service Manual man142rb...
Страница 18: ...Chapter 1 Introduction NOTES Page 1 2 Integris 2002 Headwall System Service Manual man142rb...
Страница 34: ...Chapter 2 Troubleshooting Procedures NOTES Page 2 2 Integris 2002 Headwall System Service Manual man142rb...
Страница 54: ...Chapter 3 Theory of Operation NOTES Page 3 2 Integris 2002 Headwall System Service Manual man142rb...
Страница 108: ...Chapter 5 Parts List NOTES Page 5 6 Integris 2002 Headwall System Service Manual man142rb...
Страница 110: ...Warranty Chapter 5 Parts List NOTES Page 5 8 Integris 2002 Headwall System Service Manual man142rb...
Страница 173: ...Top Cap Option P2002A Chapter 5 Parts List NOTES 5 Integris 2002 Headwall System Service Manual man142rb Page 5 71...
Страница 179: ...Spreader Bar Option P2002A Chapter 5 Parts List NOTES 5 Integris 2002 Headwall System Service Manual man142rb Page 5 77...
Страница 189: ...Lower Gas Rail Option P2002 Chapter 5 Parts List NOTES 5 Integris 2002 Headwall System Service Manual man142rb Page 5 87...
Страница 428: ...Chapter 6 General Procedures NOTES Page 6 2 Integris 2002 Headwall System Service Manual man142rb...
Страница 436: ...Chapter 7 Accessories NOTES Page 7 2 Integris 2002 Headwall System Service Manual man142rb...