Wishbone Jumbo / Wheelchair Outhouse Assembly Guide
17
Install the horizontal grab bar on the back wall above the toilet and on
the side wall nearest the toilet as shown. Position the bar correctly to
mark the ten hole locations. Drill
17
/
64
” holes. Insert the carriage bolts from
the outside and attach the grab bar with hex nuts on the inside.
15
35
"
35
"
2"
35
"
35
"
2"
Use SJ0610 (
¼
” x 1
¼
”) carriage bolts
(10) from the outside and SA0605 (
¼
”)
hex nuts (10) to install the grab bars
around the toilet as indicated
Center bar
between
vertical
channels