89008157
5
Electrical installation:
Only allow a professional electrical firm approved by the responsible energy supply
company install the electrical devices and accessories in conformance with standards
.
In the process, the Technical Connection Regulations (TAB) must be observed.
All electrical safety systems must be checked before the machine is started.
Attention! The machine must be considered live until the customer's main switch has
been switched off.
The electrician must take note of the following:
•
The total connected load of the machine is stated on the rating plate.
•
Safeguard the electrical connection of the machine with delayed-action fuses or automatic fuses in
conformance with the total connected load (see rating plate). Do not use the machine to safeguard
any other electric power consumers.
•
as required by regulations, install a main or on-off switch, as well as an FI safety switch in the electri-
cal supply line. All poles of this switch must respond when it is switched off and it must be at least 3
mm between contacts. It must be installed near the machine and be easily accessible.
•
Connect the machine to your potential equalization system. The screw for this connection is located in
the machine's base.
If you set up the machine on a supporting stand, the potential equalization system must be put be-
tween the machine and the stand.
•
The protective conductor (PE) is yellow-green, the neutral wire (N) is blue and the wires conducting
the electricity (L1, L2, L3) are black or brown.
Connecting the machine
Only the manufacturer, its customer service representative or a similarly qualified person may make changes
or replacements.
Final work:
The machine must be entirely connected to the electrical power mains and the fresh water supply and waste
water drain system. The electrical safety system must be tested and fully functional.
A Winterhalter customer service technical performs the initial start-up. In the process, the operator of the
machine is instructed in how the machine works.
3.2 Initial
start-up
After the machine has been connected to your supply lines according to regulations, contact the Winterhalter
agent responsible for your locality in order to perform the initial start-up and be instructed in how to run the
machine.
Содержание GS 310
Страница 2: ......