![Winston PRO 20 EVI Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/winston/pro-20-evi/pro-20-evi_installation-and-instruction-manual_987875031.webp)
30
Appendix
Appendix 2
:
The installation explanation of automatic filled-water
1 When automatic filled-water valve is installed,the arrowhead orientation of inlet water must
accord with the orientation of valve ;
2 Automatic filled-water has been adjusted in advance to 1.5bar
;
3 If readjust the pressure of inlet water,please operate as follows
:
* open the screw cap
(
C
);
* If reduce the pressure of water supply,pease unscrew the pressure to adjust the screw(B)
;
* If increese the pressure of waer supply,please screw down the pressure to adjust the screw (B)
4 When the system need fill water at first,wrest the handle(A) of filled-water.Then the handle(A)
can return(close) when the system is full of water.
5 Automatic filled-water Valve need clean in a periodic time and then you must close the tap,
unscrew the plug(D),remove the inside filter net.Please assemble them again after cleaning.
NOTICE
:
There are two connections for water pressure meter in the central section of
automatic filled-water,where the water pressure meter can be connected directly
and display the set pressure.The screw cap(C) must be tweaked after adjusting
the filled-water pressure.
B
C
1/4'
1/2'
D
A
Содержание PRO 20 EVI
Страница 1: ...HIGH PERFORMANCE INVERTER HEATER PRO 20 EVI Installation and Instruction Manual...
Страница 14: ...Operation and Use 1 Main interface display and function 13...
Страница 22: ...Operation and Use 21 2 Tapping system time setting button then the interface display is shown as follows...
Страница 27: ...Operation and Use 26 3 Interface diagram...
Страница 35: ...Code 20181207 0001...