background image

Fig. #3

Checking The Control Box Plugs 

Each connector is "keyed" or "indexed" for proper alignment when attached.

The drive motor plug

 should be securely connected to the lower outlet on the left side of the control 

box.

-4-

Drive Motor 

connection

Speed Control

Knob

Main Power Input 

30A 250V (L6-30)Twist-Lock Plug Furnished

II. OPERATION
A. POSITIONING OF WELDER
(For modified Bitumens APP or SBS)

The  pressure  roller  should  be  positioned  so  that  it 
rolls fully on the surface of the top sheet, about 1/4" 
inside  the  edge  of  the  shelf.  The  edge  of  the  roller 
should  not  hang  over  the  edge  to  keep  it  from 
picking up the liquefied asphalt. (See Fig. #4).

THREADING THE HANDLE.

Thread the handle to the back of the welder. Tighten down the locking bolt so that the handle is firmly 
bolted to the unit. 
Put gear lever to drive to move the welder.

(CAUTION)

 - Lifting the welder by the lever can break off the lever.

Fig. #4

Drive Motor 

Lever

Main Power 

Switch

AC Input 

Voltage

Indicator

Handle

COMPRESSION 

WHEEL

0.25"

Bleed-Out

Содержание EAGLE V42-DD

Страница 1: ...rd is included in the shipping box Please fill it out so that we can provide you any new product information or tips for better welding The serial number of your unit is located on the handle of the g...

Страница 2: ...they are too unpredictable Even when they are dedicated circuits power spikes and drops can occur resulting in sub standard equipment operation A Minimum 7 500 Watt watt capacity for the generator pro...

Страница 3: ...Check the distance between the vertical centerline of the compression roller and the tip of the nozzle The distance should normally be 21 4 21 2 55 60mm from the centerline of the roller 3 21 4 21 2 C...

Страница 4: ...re roller should be positioned so that it rolls fully on the surface of the top sheet about 1 4 inside the edge of the shelf The edge of the roller should not hang over the edge to keep it from pickin...

Страница 5: ...at the edge of the seam Usually about 10 FPM Feet per minute One revolution of wheel equals one foot of travel Increasing the temperature slowing the speed and increasing the pressure will all increa...

Страница 6: ...nalysis should be performed at the beginning of a day s production and at any significant change in operating environment such as A ten degree F change in ambient temperature A significant change in c...

Страница 7: ...cord or electrical connection Keep clear of the heat gun nozzle Exposed skin will burn upon contact Always heat seam in a well ventilated area Do not inhale fumes caused by the heat seaming process Do...

Страница 8: ...wer motor for 3 4 seconds and observe the amount of sparks If sparks are larger than 1 16 consult the manufacturer Motor replacement may be needed 9 Unplug the main power and heatgun connectors and sl...

Страница 9: ...tion 23 on the part sheet UNIT JERKING 1 Check for low voltage on the control box voltmeter See Fig 3 Should be 210 to 250 VAC 2 Check drive engage disengage gear lever 3 Increase speed setting slight...

Страница 10: ...period The complete unit or defective module must be returned to a factory authorized service center freight prepaid preferably with a letter of explanation CONDITIONS This warranty does not apply if...

Страница 11: ......

Страница 12: ......

Страница 13: ......

Отзывы: