SECTION 13
SLIDEOUT ROOM
13-4
cific instructions on which valves to open
for front or rear slideout rooms and what
additional precautions to follow.
•
Open the two slideout solenoid valves (with
1/4” nuts on the ends) on the motor end of the
pump to relieve hydraulic line pressure. (See
following photos.)
DO NOT LOOSEN
NUTS MORE THAN 4 FULL TURNS.
•
Do not open any of the four large T-handled
valves on the opposite end of the pump.
These regulate the coach leveling jacks
.
Step 2 - Crank the Room Inward
•
A wrench is used to crank the room inward.
You may use the ratchet wrench supplied
with the coach (in one of the storage compart-
ments) or any type of lug wrench of the same
nut size.
•
Crank-in bolts are located on the outboard
mounting plates of the slideout room as
shown. These plates are located at both ends
of the room inside the StoreMore
TM
compart-
ment doors.
•
Loosen the locking screws at the crank-in
bolt shafts as shown before trying to turn the
bolts.
•
After loosening the lock screws, fit the
ratchet wrench onto the bolt head and begin
cranking clockwise slowly a few turns, then
alternate to the other side for a few turns.
With an assistant using an additional wrench,
crank both sides evenly together to speed this
process.
Crank the wrench(es) clockwise slowly, until
the room is fully retracted. Allow about 10
minutes to crank room in fully.
Use provided 1/4” nut driver to turn nut
counterclockwise 4 turns only.
Slideout Room Solenoid Valve
Leveling Jack Valves - Do Not Open
Stop Bolt
Retract Bolt