RP100XD MK2
OPERATIONAL AND SAFETY
REQUIREMENTS
PRE-DELIVERY
1.1
Drive coupling alignments, pan and star meshing of pan rack and drive gear.
1.2
Operating clearances star blade to pan. Fixed blade to pan wall.
1.3
Correct oil level in gearboxes. All grease points charged. Gear teeth greased.
1.4
No load test. Correct rotations.
PRE INSTALLATION
2.1
Check consignment.
2.2
Offload equipment using certified lifting gear of suitable capacity, by a competent
person (see separate chart for nett weight).
INSTALLATION
3.1
Refer to contract arrangement and site instructions.
3.2
Mixer to be mounted on supports of adequate strength and rigidity to prevent undue
vibration when mixing and securely bolted.
3.3
Mixer frame to be level on structure, add packers as required.
3.4
Check that pan is correctly seated and that pan rack and drive gear are in correct
mesh.
ELECTRICAL SERVICES
4.1
Refer to wiring diagram in Ops Manual. All wiring to be undertaken by competant
electrician, it is recommended that the mains electrical supply is provided via an earth
leakage circuit breaker.
NOTE:
electrical cables particularly those with copper
conductors suffer from a condition known as ‘relaxation’ which may cause wiring to
work loose over a period of time, it is recommended that the tightness of wiring
connections and terminals are checked following the first month in service.
Содержание CUMFLOW RP100XD MK2
Страница 2: ......
Страница 5: ......
Страница 6: ...OPERATING AND MAINTENANCE MANUAL SECTION 1 GENERAL INFORMATION RP100XD MK2 ...
Страница 7: ......
Страница 14: ...INSTALLATION DRAWING ...
Страница 15: ......
Страница 16: ...OPERATING AND MAINTENANCE MANUAL SECTION 2 INSTALLATION AND OPERATING INSTRUCTIONS ...
Страница 17: ......
Страница 25: ......
Страница 26: ...OPERATING AND MAINTENANCE MANUAL SECTION 3 TECHNICAL SPECIFICATION AND MAINTENANCE ...
Страница 27: ......
Страница 33: ...LUBRICATION CHART ...
Страница 34: ......
Страница 35: ...OPERATING AND MAINTENANCE MANUAL SECTION 4 MIXER SPARE PARTS ...
Страница 36: ......
Страница 37: ...RP100XD MK2 MIXING PAN DRIVE ...
Страница 39: ...RP100XD MK2 STAR DRIVE ASSEMBLY ASSEMBLED LENGTH OF COUPLING ITEM 3 ON SHAFTS IS 73MM ...
Страница 42: ...RP100XD MK2 MIXING STAR ASSEMBLY ...
Страница 44: ...RP100XD MK2 MIXING STAR LIFTING ARRANGEMENT ...
Страница 46: ...RP100XD MK2 COVERS GUARDS ...
Страница 49: ...PAGE INTENTIONALLY BLANK ...
Страница 52: ...RP100XD MK2 DECALS AND LOGOS CROKER CUMFLOW RP100XD 1 2 4 5 6 7 8 9 10 11 12 13 ...
Страница 54: ......
Страница 55: ...OPERATING AND MAINTENANCE MANUAL SECTION 5 ANCILLARY EQUIPMENT SPARE PARTS ...
Страница 56: ......
Страница 57: ...PAGE INTENTIONALLY BLANK ...
Страница 58: ...RP100XD PAN TROLLEY ...
Страница 60: ...RP100XD FOUR WHEEL PAN TROLLEY ...
Страница 63: ......
Страница 64: ...OPERATING AND MAINTENANCE MANUAL SECTION 6 ELECTRICAL SYSTEM ...
Страница 65: ......
Страница 66: ...Electrical Control Circuits dwg 11 03 02 10 55 09 Scaled to fit ...
Страница 67: ...V06302 dwg 11 12 02 07 03 44 Scaled to fit ...
Страница 68: ...Electrical Power Circuits dwg 11 03 02 10 58 17 Scaled to fit ...
Страница 69: ...V06303 dwg 11 12 02 07 04 45 Scaled to fit ...
Страница 70: ...General details of Control Panel dwg 11 03 02 11 01 09 Scaled to fit ...
Страница 71: ...V06301 dwg 11 12 02 07 02 37 Scaled to fit ...
Страница 72: ...Material Parts List dwg 11 03 02 11 03 32 Scaled to fit ...
Страница 73: ...V063PL1 dwg 11 12 02 07 01 06 Scaled to fit ...
Страница 74: ......
Страница 75: ...OPERATING AND MAINTENANCE MANUAL SECTION 7 MISCELLANEOUS ...
Страница 76: ......