
16
STRUCTURE AND INSTALLATION
The following pictures only show the structure of the appliance. The dimension and shelf
quantity may differ among the models of the same series.
STRUCTURE
INSTALLATION DRAWING
ACCESSORY INSTALLATION BEFORE OPERATING
UNPACKING AND CLEANING THE WINE COOLER
• Remove the exterior and interior packing materials.
• Let the appliance stand upright for approximately
24 hours
before connecting it to the power source, which
helps to reduce the possibility of a cooling-system malfunction from handling during transportation.
• Use a soft cloth to clean the interior surface with water
.
• Install the door handle provided with the appliance by following these steps:
-
Remove the gasket on the internal
Door to expose the two screw holes
.
Содержание WC18FGBK
Страница 12: ...24...