background image

MAINTENANCE 

86038450   04/12/07 

4-2ENG 

 
WEEKLY MAINTENANCE 
1. 

Use a hydrometer to check the condition of each 
battery cell. 

2. 

Check battery cable clamps.  Ensure clamps are 
tight on battery terminals. 

3. 

Clean tops of batteries with a wet cloth and a 
solution of water and baking soda.  Wipe battery 
tops dry after cleaning. 

4. 

Check pad lock for looseness or damage. 

5. 

Check filter and filter seals.  Airflow should be 
unobstructed through filter. 

6. 

Ensure that the pivot points and casters are 
properly lubricated. 

7. 

Tighten any loose screws or nuts. 

 

4 TO 6 MONTH MAINTENANCE 
1. 

 Remove batteries-clean battery tray and battery 
compartment.   

2. 

Clean battery cable clamps and battery 
terminals. 

3. 

Check the carbon motor brushes in the pad 
driver motor.   

4. 

Use a vacuum to remove lint or dust build-up 
from motor windings. 

5. 

Grease axles. 

 

AT THE END OF EACH WORK PERIOD: 
1. 

Wipe down the exterior of the machine. 

2. 

Lower the deck. 

3. 

Open the cover. 

4. 

Charge the batteries.  (See battery charging 
procedure on page 4-1.) 

 

SHUNT ADJUSTMENT 

This pad pressure meter adjustment is factory set.  
Over the course of time it may become necessary to 
adjust this setting using the slotted connection on 
the shunt. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 

 
SHUNT ADJUSTMENT (Cont.) 

Check the amp range when nuisance tripping of the 
circuit breaker indicates that the shunt may be out of 
adjustment. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

1. 

Connect a DC ampere meter to the positive 
battery lead. Running the machine with a pad, 
lower the pad to the floor until it is operating at 
55-60 amps. 

2. 

Moving the wire in the slot, adjust the pad 
pressure meter until the needle sets at the line 
between the green and red areas. 

3. 

Check the other points indicated in the diagram 
above. The high end should trip the circuit 
breaker. Replace the pad pressure meter if the 
approximate amp ranges shown cannot be set. 

 

 

 

 

SHAFT ADJUSTMENT 

If shaft is replaced make sure it is adjusted 
correctly upon installation. 

5/8"

Содержание Lightning Battery Burnisher 10027100

Страница 1: ...Operating Instructions ENG Bedienungsanleitung GER Read these instructions before operating the machine Bitte lesen Sie diese Anleitungen bevor Sie die Maschine in Gebrauch nehmen MODEL L20 10027100 L...

Страница 2: ...________________________________________________________________ Phone Number _________________________________________________________________________________________ MODEL __________________________...

Страница 3: ...tery Information 4 1 Battery Connection 4 1 Battery Maintenance 4 1 Battery Charging Procedure 4 1 Maintenance 4 2 Weekly Maintenance 4 2 4 to 6 Month Maintenance 4 2 Ending Work Periods 4 2 Shunt Adj...

Страница 4: ...aintenance Shunt Adjustments Shaft Adjustment Lubrication Troubleshooting The PARTS LIST section contains assembled parts illustrations and corresponding parts list The parts lists include a number of...

Страница 5: ...ories shops and offices for more than normal housekeeping purposes Maintenance and repairs must be done by qualified personnel If foam or liquid comes out of machine switch off immediately Disconnect...

Страница 6: ...information carefully Know when these conditions can exist Locate all safety devices on the machine Please take the necessary steps to train the machine operating personnel FOR SAFETY DO NOT OPERATE M...

Страница 7: ...l circuit breaker protects lift mechanism Press to reset 7 Main Handle 8 Handle Adjustment Lever 9 Breaker 60 amp magnetic circuit breaker protects pad driver motor Press to reset 10 Pad Motor Switch...

Страница 8: ...g burnishing head switch 5 The pad motor will only run when the burnishing head is lowered to within 3 inches of the floor 6 The drive controls are shown on page 3 1 7 The pad pressure is adjusted usi...

Страница 9: ...S NEAR BATTERIES AT ANY TIME WEAR EYE PROTECTION AND PROTECTIVE CLOTHING WHEN WORKING WITH BATTERIES CHARGE BATTERIES IN A WELL VENTILATED AREA WITH DECK DOWN AND COVER OPEN 1 Use a 36 volt 20 amp max...

Страница 10: ...CH WORK PERIOD 1 Wipe down the exterior of the machine 2 Lower the deck 3 Open the cover 4 Charge the batteries See battery charging procedure on page 4 1 SHUNT ADJUSTMENT This pad pressure meter adju...

Страница 11: ...rrosion cracks and evidence of overheating Check all bearings for noise Check skirt bumpers for damage and replace as necessary Grease wheels and casters if appropriate Check potentiometer speed contr...

Страница 12: ...wer switch If the test voltage at C 5 to C 2 is 34 to 38 VDC the voltage at deck switch C 3 to C 6 should be 34 to 38 VDC when the deck switch is pressed to raise lower the pad If not replace deck swi...

Страница 13: ...respond and all the tests above have been done replace the motor Loose Connection With main power on test voltage at terminal 30 X on Relay should be 34 to 38 VDC With switch on check voltage to wire...

Отзывы: