MACHINE OPERATION
86037660 CHARIOT 11/09/06
3-15
PRE-RUN MACHINE INSPECTION
Do a pre-run inspection to find possible problems
that could cause poor performance or lost time from
breakdown. Follow the same procedure each time to
avoid missing steps.
NOTE:
See maintenance section for pre-run
machine inspection checklist items.
STARTING MACHINE
NOTE:
Perform pre-run machine check before
operating machine.
FOR SAFETY:
Before starting machine, make
sure that all safety devices are in place and
operating properly.
1.
The operator should be on the pedal platform
with their left foot on the operator presence
pedal. The throttle pedal must be in the neutral
position.
2.
Turn the machine power on by turning key
switch clockwise to the “ON” position.
3.
Check the position of the Directional Control
Switch to make sure the machine will travel in
the direction intended.
4.
Press the Drive Reset Switch.
5.
Press lightly on the throttle pedal with right foot.
EMERGENCY STOP PROCEDURES
1.
Release the throttle pedal by lifting right foot.
2.
Turn machine power off with key switch, by
turning key switch counterclockwise.
3.
If an electrical problem is suspected, push in
emergency stop button. This will also engage
the parking brake and cause the machine to
stop immediately.
Содержание chariot iSCRUB 10060210
Страница 12: ...DRIVE CONTROLS 86037660 CHARIOT 11 09 06 3 5 11 Basic 10 Basic 9 8 7 6 5 4 3 2 1 ...
Страница 27: ...NOTES 86037660 CHARIOT 11 09 06 3 20 ...
Страница 51: ...MAINTENANCE DRIVE MOTOR BRAKE 86037660 CHARIOT 11 05 07 4 24 1 Drive motor 2 Parking brake 3 Drive chain ...
Страница 61: ...NOTES 86037660 CHARIOT 11 09 06 4 32 ...