- Close the discharge valve (3) and open the air vent screw (5).
- Open the suction valve (2) to fill the pump with water.
- Close the suction valve when water comes out from the air vent screw.
- Close the air vent screw.
9
2
4
7
2 12
12
5
6
3
7
1-phase
220V
60Hz
HC
MIN
10
11
8
운반·설치상의 주의사항
USAGE
The suction pipe should be larger than the discharge pipe.
Make the piping run as short as possible and minimize the number of elbows.
The piping should be adequately supported on both sides to reduce mechanical stress on the pump.
* Install a stop valve on the suction side and the discharge side of the pump.
①
Priming the pump:
The pump must not be run dry.
1. Make sure the pump has been primed and open the discharge valve.
2. Switch on the power and verify that the motor rotates in right direction. Then turn on the power to pump up water.
3. If water is not primed up, power off and reprime the pump.
4. Make sure that the pump operates without any problem. Then open and close the water tap to verify no leakage.
●
Check the pressure gauge to confirm stable suction and discharge pressure. If the pressure fluctuates,
Reprime the pump.
●
Verify the electronic current flow doesn
’
t exceed the rated value marked on the nameplate.
②
Start-up of the pump
Piping
Test running
※
Recommended suction pressure : 0.2kgf/cm
2
※
Maximum suction pressure : 6kgf/cm
2
1. Foot valve, strainer
2. Stop valve on the
suction side
3. Stop valve on the
discharge side
4. Check valve
5. Air vent screw
6. Drain cap
7. Pipe support
8. Strainer
9. Water tank
10. Piping
11. Monitor protector
12. Union
Part Description
11
Содержание PBI-L203MA
Страница 15: ...WIRING DIAGRAM PERFORMANCE CURVE 15 Pump Red Green Black RS232 Black Blue Yellow...
Страница 28: ...MEMO...
Страница 29: ...MEMO...
Страница 30: ...MEMO...
Страница 31: ...MEMO...
Страница 32: ...P NO 3057884 Rev 0 NOV 2014 Printed in Korea...