background image

GWS-090E

 

Gas-Fired Water Boiler – 

Boiler Manual

2

Part Number 550-110-737/1108

Codes & checklist

When servicing boiler —

1.  To  avoid  electric  shock,  disconnect  electrical  supply 

before performing maintenance.

2.  To avoid severe burns, allow boiler to cool before per-

forming maintenance.

Boiler operation —

3.  Do  not  block  flow  of  combustion  or  ventilation  air  to 

boiler.

4.  Should overheating occur or gas supply fail to shut off, do 

not turn off or disconnect electrical supply to circulator. 
Instead, shut off the gas supply at a location external to 
the appliance.

5.  Do not use this boiler if any part has been under water. 

Immediately call a qualified service technician to inspect 
the boiler and to replace any part of the control system 
and any gas control that has been under water.

Boiler water —

6.  DO NOT use petroleum-based cleaning or sealing com-

pounds in boiler system. Water seal deterioration will oc-
cur, causing leakage between boiler sections, circulator 
flanges, diaphragm tanks or other system components. 
This can result in substantial property damage.

7.  DO  NOT  use  “homemade  cures”  or  “boiler  patent 

medicines”.  Serious  damage  to  boiler,  personnel  and/
or property may result.

8.  Continual fresh makeup water will reduce boiler life. Min

-

eral buildup in sections reduces heat transfer, overheats 

cast iron, and causes section failure. Addition of oxygen 

and  other  gases  can  cause  internal  corrosion.  Leaks 
in boiler or piping must be repaired at once to prevent 
makeup water.

9.  Do not add cold water to hot boiler. Thermal shock can 

cause sections to crack.

Glycol — potential fire hazard —

All glycol is flammable when exposed to high temperatures. If 

glycol is allowed to accumulate in or around the boiler or any 
other potential ignition source, a fire can develop. In order to 
prevent potential severe personal injury, death or substantial 
property damage from fire and/or structural damage:

•  Never  store  glycol  of  any  kind  near  the  boiler  or  any 

potential ignition source.

•  Monitor and inspect the system and boiler regularly for 

leakage. Repair any leaks immediately to prevent pos-
sible accumulation of glycol.

•  Never use automotive antifreeze or ethylene glycol in 

the system. Using these glycols can lead to hazardous 

leakage of glycol in the boiler system. 

1  Prepare boiler location

Read this first!

Installations must follow these codes:

•  Local, state, provincial, and national codes, laws, regulations 

and ordinances.

•  National Fuel Gas Code, ANSI Z223.1–latest edition.
•  Standard for Controls and Safety Devices for Automatically 

Fired Boilers, ANSI/ASME CSD-1, when required.

•  National Electrical Code.
•  For Canada only: B149.1 or B149.2 Installation Code, CSA 

C22.1 Canadian Electrical Code Part 1 and any local codes.

  Read and follow the special instructions for the Com-

monwealth of Massachusetts, located on page 4

of this manual.

Certification

  The GWS-090E boiler gas manifold and controls met 

safe lighting and other performance criteria when 

boiler underwent tests specified in ANSI Z21.13–

latest edition.

Before locating the boiler:

❏ 

Check for nearby connection to:

• 

System water piping

• 

Venting connections

• 

Gas supply piping

• 

Electrical power

❏ 

Check area around boiler. Remove any combustible materials, 
gasoline and other flammable liquids.

  Failure to keep boiler area clear and free of com-

bustible  materials,  gasoline  and  other  flammable 
liquids  and  vapors  can  result  in  severe  personal 
injury, death or substantial property damage.

❏ 

Boiler must be installed so that gas control system components 
are protected from dripping or spraying water or rain during 
operation or service.

❏ 

If new boiler will replace existing boiler, check for and correct 
system problems, such as:

1.  System leaks causing oxygen corrosion or section cracks from 

hard water deposits.

2.  Incorrectly-sized expansion tank.
3.  Lack of antifreeze (when required) in boiler water causing system 

and boiler to freeze and leak.

  The  boiler  contains  ceramic  fiber  and  fiber-

glass materials. Use care when handling these 

materials per instructions on page 21 of this 
manual. Failure to comply could result in severe 
personal injury.

  Failure to adhere to the guidelines below can 

result in severe personal injury, death or sub-
stantial property damage.

Содержание GWS-090E

Страница 1: ...at will or can cause minor personal injury or property damage Special instructions on installation operation or maintenance that are important but not related to personal injury or property damage INS...

Страница 2: ...and boiler regularly for leakage Repair any leaks immediately to prevent pos sible accumulation of glycol Never use automotive antifreeze or ethylene glycol in the system Using these glycols can lead...

Страница 3: ...oded the boiler mounting area is not level 2 See Table 2 below for minimum foundation dimensions Residential garage installations Take the following special precautions when installing the boiler in a...

Страница 4: ...hood relief opening after 5 minutes of main burner operation Use the flame of a match or candle f After it has been determined that each appliance remaining connected to the common venting system prop...

Страница 5: ...t is free of the contaminants listed in Table 3 Allowing the boiler to operate with contaminated air can cause damage to the boiler and vent system resulting in possible severe personal injury death o...

Страница 6: ...s Code for dealing with other conditions Louver allowance The free area of openings means the area after reduction for any installed louvers or grilles Be sure to consider this reduction when sizing t...

Страница 7: ...Part Number 550 110 737 1108 GWS 090E Gas Fired Water Boiler Boiler Manual Figure 2 Provide minimum air openings for GWS 090E boiler installations based on following 1 Prepare boiler location continue...

Страница 8: ...ler resulting in substantial property damage Do not use petroleum based cleaning or sealing compounds in boiler system Severe damage to boiler will occur resulting in substantial property damage Drain...

Страница 9: ...Set second control to minimum 20 F above setpoint of first control Maximum allowable setpoint is 240 F See page 18 for wiring A low water cutoff device is required when boiler is installed above radia...

Страница 10: ...boiler Consult I B R Installation and Piping Guides If boiler is connected to heating coils located in air handling units where they can be exposed to refrigerated air use flow control valves or othe...

Страница 11: ...gh to allow temperatures to level off It takes a while for the boiler water temperature to rise as the flow changes 3 Bypass valve 2 allows hot boiler outlet water to blend with colder return water ra...

Страница 12: ...al Gas 1 See Table 6 for pipe length and diameter Base on rated boiler input divide by 1 000 to obtain cubic feet per hour Table 6 is only for gas with specific gravity 0 60 with a pressure drop throu...

Страница 13: ...s which prohibit installation of fused disconnect or service switch on boiler install a 2 x 4 cover plate on the boiler junction box and mount the service switch remotely as required by the code Wirin...

Страница 14: ...ycol level to drop Added water will dilute the antifreeze reducing the freeze protection level Fill the system with water 1 Close manual and automatic air vents and boiler drain cock 2 Fill to correct...

Страница 15: ...resh makeup water will reduce boiler life Minerals can build up in sections reducing heat transfer overheating cast iron and causing section failure If you discover evidence of any gas leak shut down...

Страница 16: ...est ignition system safety device Connect manometer to outlet side of gas valve Start boiler a allowing for normal start up cycle to occur and main burn ers to ignite With main burners on manually shu...

Страница 17: ...pilot does light and control module senses flame current spark generator is turned off and main valve opens 4 The GWS 090E timer relay delays high fire for the first 60 seconds of main flame 5 During...

Страница 18: ...GWS 090E Gas Fired Water Boiler Boiler Manual 18 Part Number 550 110 737 1108 Figure 13 Wiring diagram GWS 090E boilers 9 Sequence of operation continued...

Страница 19: ...19 Part Number 550 110 737 1108 GWS 090E Gas Fired Water Boiler Boiler Manual 10 Operating instructions...

Страница 20: ...ed problems Boiler area Air openings Flue gas vent system Pilot and main burner flames Water piping Boiler heating surfaces Burners base and inlet air box Condensate drain system o Service Inducer mot...

Страница 21: ...place it in a plastic bag for dis posal Wash potentially contaminated clothes separately from other clothing Rinse clothes washer thoroughly NIOSH stated First Aid Eye Irrigate immediately Breathing...

Страница 22: ...interior 3 Inspect the boiler vent outlet area and heating surfaces by looking through the opening 4 If the vent pipe or inducer interior show evidence of soot fol low Cleaning boiler heating surface...

Страница 23: ...below boiler temperature Boiler should cycle off Return dial to original setting 2 Inspect and test additional limit controls or low water cutoffs installed on system Expansion tank 1 Expansion tanks...

Страница 24: ...taken to avoid contact with hot water and to avoid water damage Before operating lever check to see that a discharge line is connected to this valve direct ing the flow of hot water from the valve to...

Страница 25: ...djusted by regulator on gas valve c Verify gas manifold pressure as shown on page 24 Check pressure switch setting Make sure boiler water temperature is 100 F or cooler before starting procedure to ob...

Страница 26: ...rt 4 PRESS SWITCH light flashing FLAME light flashing For insufficient heat or no heat problem go to Chart 7 if POWER light is on steady with no other light flashing No Yes On steady not flashing No Y...

Страница 27: ...black low voltage leads in J box Connect a voltmeter across these two incoming wires Close each thermostat zone valve and relay in the external circuit one at a time and check the voltmeter reading ac...

Страница 28: ...ion 12 Replace if necessary Retest Try reseating plug in module receptacle and restart If inducer still does not work replace inducer assembly Retest No Yes Wait 45 seconds Does inducer motor operate...

Страница 29: ...art boiler following Operating instructions in this manual Section 10 Do FLAME and POWER lights still flash Boiler should now operate normally Original flashing FLAME light caused by gas valve not ope...

Страница 30: ...eter indicate the switch is closed Inspect and check wire harness from control module to pressure switch Reseat connector in control module receptacle If harness is intact and properly seated but prob...

Страница 31: ...ach sense lead from ignition control Connect negative lead of MICROAMMETER to control sense terminal Connect positive lead of MICROAMMETER to sense wire DISCONNECT red wire connected to terminal MV of...

Страница 32: ...ping free of blockage No Yes Correct conditions and recheck operation See Figure 12 page 17 for normal sequence of operation Check heat loss calculation versus boiler size Clock gas input Replace cont...

Страница 33: ...of this manual Failure to comply could result in severe personal injury Item number Description Part number not shown Replacement section assembly GWS 090E 321 114 346WT 1 Radiation plate 1 per joint...

Страница 34: ...e in Base assembly 5 Base left side panel in Base assembly 6 Base right side panel in Base assembly 7 Base back panel in Base assembly 8 Base front cross tie assembly in Base assembly 9 Pilot bracket...

Страница 35: ...number 1 Jacket panel left side with insulation Natural gas Propane 431 223 490WT 431 223 496WT 2 Junction box 2 x 4 available at local supply house 3 Jacket panel right side with insulation 431 223 4...

Страница 36: ...920WT Conbraco Watts 10 408 05 335 511 546 924WT 2 Combination pressure temperature gauge with 2 short shank Ametek ENFM PTA 1088 4104 510 218 099WT 3 Drain valve Fittings shown are included with boil...

Страница 37: ...fice and aluminum pilot gas tubing Weil McLain 511 330 081WT Natural gas and propane gas components 3 Control module UnitedTechnologies 1107 1 511 330 090WT not shown Wiring harness control Weil McLai...

Страница 38: ...IN INCHES 14 Dimensions Boiler model number Supply tapping inches NPT Return tapping inches NPT Gas connection size Note 3 inches NPT Gas manifold size Note 3 inches NPT A Air inlet pipe center inches...

Страница 39: ...tings are based on a piping and pickup allowance of 1 15 An additional allowance should be made for unusual piping and pickup loads 4 The GWS 090E boiler requires special venting consistent with Categ...

Страница 40: ...ermanently mounted to the exterior of the build ing at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appli...

Отзывы: