background image

Wilks

 Enterprise Inc

 

 

                                            InfraRan Instruction Manual

 

 

19

 10.0   Power Sources : 

 
 
        When changing the power source from battery to mains power or the reverse, the 
        instrument zero should always be redetermined. 
 
 

11.0  Quick Start Instructions : 
 
 
                              1.   Turn on power (allow 30  minute warm up) 
 
                              2.   Select Control -  Select (Battery) Check Battery Status 
 
                              3.   Select Analyze -  Select (Rezero) Prompt to Install Zero Filter 
  
                                                                  Hit (Zero) Count Down 30 seconds 
 
                              4.   Select Run -  Prompt to Install Particulate Filter 
 
                                                           Hit (Run) Count Down 30 seconds 
 
  
                                           YOU ARE READY TO SAMPLE! 
 
 
12.0   USB Driver Installation : 

 
 
 
1.  Plug in the USB cable from the host computer to the InfraRan USB mini B port. 
 
2.  The host computer will come up with a dialog box, noting that it has found new 
     hardware and asking where to find the driver. 
 
     Place the driver/utilities CD into the host computer CDROM drive and continue 
     with the driver installation by directing the Windows driver dialog box to the driver 
     directory on the CDROM 

( Please note : Windows XP has the proper driver included 

     in the operating system, so the driver CD should not be needed for the USB   
     installation ). 

 
3.  After the installation of the driver, confirm that a new COM port has been added to 
     the host computer. 
 
 
 
 

Содержание InfraRan

Страница 1: ...InfraRan is a trademark of Wilks Enterprise Inc Copyright 2004 2008 Wilks Enterprise Inc Norwalk Ct USA...

Страница 2: ...2 SOFTKEY MENU OPERATIONS MAP 10 7 2 1 TOP MENU 10 7 2 2 ANALYZE MENU 10 7 2 3 RUN MENU 11 7 3 FILES MENU 12 7 4 SETUP MENU 12 7 4 1 DIAG MENU 13 7 4 2 CLOCK MENU 14 7 43 ANALYSIS MENU 14 7 4 4 LOG M...

Страница 3: ...18 1 ANALOG OUTPUT 28 19 0 SPECIFICATIONS 29 20 0 TROUBLESHOOTING 30 21 0 SERVICE AND CUSTOMER SUPPORT 32 FIGURE 1 INFRARAN OPTICAL SYSTEM WITH 16CM CELL 4 FIGURE 2 INFRARAN OPTICAL SYTEM WITH 6M CEL...

Страница 4: ...n the instrument is received examine the container for damage unpack the container and check its contents 1 InfraRan Analyzer 1 Charger AC Adapter InfraRan Interconnect Cable 1 Sampling Hose Particula...

Страница 5: ...e window of a tubular single pass transmission cell or a folded path multipass cell A portion of the energy is absorbed by the sample The infrared beam passes through an exit window then through an op...

Страница 6: ...ly 4 more hours the detector voltage varies approximately linearly with temperature during the warm up period The linear fit should not be counted as being appropriate for a long time Each time the In...

Страница 7: ...Wilks Enterprise Inc InfraRan Instruction Manual 6 Figure 3 InFraRan Controls and Connections...

Страница 8: ...the inlet and outlet it is advised that an external pump be used It is not recommended that an external pump be attached to the internal pump as this may cause pressure or a vacuum differential that c...

Страница 9: ...d be taken to ensure that the strap is in good condition and properly used Occasionally check the strap hooks for cracks and that the metal safety clip is intact and properly operating Check the strap...

Страница 10: ...previous menu item The up arrow forwards to the next menu item The right arrow enters a space Keypad Backlight option This button by default selects Survey fast or Analyze normal mode The Survey fast...

Страница 11: ...lyze Menu REZERO Prompts user INSTALL ZERO FILTER Press ZERO Softkey Timer countdown 30 seconds to introduce fresh air Timer countdown 30 seconds to zero instrument Display zero voltage of detector RU...

Страница 12: ...ions LOG ON indicates that the logging operation is currently off Pressing LOG ON will change the softkey to LOG OFF and display a LOG ON indication on the top left of the display Pressing the LOG OFF...

Страница 13: ...Press ENTER to accept changes ERASE Prompts user to delete file press ENTER key to erase data in current file ESCAPE cancels erase operation ESCAPE Returns to prior menu 7 4 Setup Menu DIAG Diagnosti...

Страница 14: ...gs containing information on current calibrated gas s ESCAPE Returns to prior menu 7 4 1 Diag Menu VERIFY Prompts calibration standard concentration Press ENTER to start verification Prompts user to i...

Страница 15: ...ar Month Date with keys on keypad TIME Set Hour Minute Second with keys on keypad ESCAPE Returns to prior menu 7 43 Analysis Menu LOG Settings for logging functions on off status mode and interval DIS...

Страница 16: ...from 1 second to 1 minute ESCAPE Returns to prior menu Note The analyzer does not average readings over the time period set in interval Instead the analyzer will take a snapshot of the concentration...

Страница 17: ...ctory Set k Factory Set Range Factory Set Scale Factor Factory Set Temp Comp Factory Set High Alarm User Select Low Alarm User Select ID Number User Select When all the calibration values have been en...

Страница 18: ...rcent of charge on analyzer battery BRIGHT Selectable display brightness from 25 to 100 set to 25 for best battery life ESCAPE Returns to prior menu Note Setting the pump or alarms either on or off ef...

Страница 19: ...this mode is enabled The fast mode is intended for detecting leaks or hot spots The measurements are not signal averaged In this mode the display is considerably noisier than in the normal mode but r...

Страница 20: ...YOU ARE READY TO SAMPLE 12 0 USB Driver Installation 1 Plug in the USB cable from the host computer to the InfraRan USB mini B port 2 The host computer will come up with a dialog box noting that it h...

Страница 21: ...n Manual 20 From the Control Panel select the SYSTEM icon Click on the Hardware Tab and then click on the Device Manager Button Confirm that an additional COM port has been added the host computer It...

Страница 22: ...ow Control With the InfraRan USB cable plugged in and the analyzer on press ANALYZE then RUN After the analyzer has started the RUN cycle a continuous stream of data should be now displayed on hyperte...

Страница 23: ...Select Capture Text a Name File b Hit Start 14 2 Using the Excel Spreadsheet Download Note Before using the spreadsheet program the cheapcomm program available on the CD must be loaded first A Open th...

Страница 24: ...en C Change the COM port number to the correct port that the InfraRan USB port is assigned Click on the current COM port assignment in the Enter Serial Port box Change the COM number in the fx formula...

Страница 25: ...sing the Download then Files softkeys on the InfraRan followed by ENTER on the keypad G The Excel program should now display Transfer In Progress in the Download report button After the transfer is co...

Страница 26: ...analysis functions external to the InfraRan analyzer Or to perform external logging functions The data stream 13MAR06 12 29 11 2 7553 0 0 0077 2 7535 20 67 123 Field 1 2 3 4 5 6 7 8 1 Date DDMMMYY 2 T...

Страница 27: ...Wilks Enterprise Inc InfraRan Instruction Manual 26 16 0 Input Output and Power Connectors Figure 8 Analyzer Connections...

Страница 28: ...nalyzer on it s side remove the 4 retaining screws and the battery door 2 Loosen the two thumb screws on the battery cover Swing the cover out and lift out the cover from it s retaining slot 3 Press i...

Страница 29: ...ata string It is generated by an eight bit digital to analog converter DAC The correspondence between the analog signal and the digital value is determined by the Range setting found in the Setup Cali...

Страница 30: ...99 gas exchange Measurement Cycle Display updated every 1 5 sec Source Pulsed thin film element Communications RS 232 DB 9 connector Communications protocol 9600 baud 8 N 1 Concentration Alarm Two le...

Страница 31: ...severe mechanical shock optical components source detector gas cell or electronic components have failed Useful measurements will not be possible The analyzer must be returned to Wilks Enterprise for...

Страница 32: ...de Press Control Pump If Pump Off is highlighted press the key under Pump On to turn the pump on You should be able to hear the pump and feel vacuum at the inlet and pressure at the outlet If the pump...

Страница 33: ...u are recommended to contact your local representative or dealer first If the analyzer was purchased direct or if there are problems that are unanswered by the local representative or you have a techn...

Страница 34: ...Ran Instruction Manual 33 ITEM DESCRIPTION QTY P N 1 2 3 4 5 6 Parts List 206 2139 205 1036 206 2140 205 1035 205 1034 1 1 1 1 1 1 FILTER HOLDER FILTER GASKET PLUG ADAPTER SWAGELOK NUT SWAGELOK PORTAD...

Страница 35: ...EM DESCRIPTION QTY P N Parts List 1 2 3 4 5 6 7 8 Wand Handle Handle Grip Sample Tube 1 4 Inch Port Adapter Swage Nut 1 4 NPT To 1 4 Swage Adapter Filter Soft Nylon Tubing 1 1 1 2 2 1 1 4 Ft 206 2124...

Страница 36: ...Wilks Enterprise Inc InfraRan Instruction Manual 35...

Страница 37: ...Wilks Enterprise Inc InfraRan Instruction Manual 36...

Страница 38: ...e Gore Battery Vent Screw In Plug Painted 832 x 1 2 Flathead Screw 1 4 20 x 1 Caphead Screw 1 4 20 Large Pattern Flat Washer 1 4 20 Jam Nut Right Side Panel Left Side Panel H Gasket 50 In Length Batte...

Страница 39: ...Wilks Enterprise Inc InfraRan Instruction Manual 38...

Страница 40: ...on Manual 39 NORWALK CT A Assy Chassis Assy 112 0004 1 2 3 VFD Display Display Mount 440 SEMS 312 0001 206 2102 Indirect 1 1 4 4 5 6 Upper Chassis Rubber Mount 440 SEMS 206 2112 205 1021 Indirect 1 16...

Страница 41: ...400 1008 1 2 3 4 5 6 7 8 9 10 11 Signal Conditioning Board Assy CPU Board Accessory Board CPU To Accessory Board Cable VFA Cable CPU to S C Board Cable Connector Plate Assy 4 40 x 1 2 SEMS 4 40 x 3 8...

Страница 42: ...Wilks Enterprise Inc InfraRan Instruction Manual 41 Parts List Item Desc P N Qty 12 13 14 4 40 x 1 4 SEMS 4 40 x 1 4 Flathead Screw Battery Compartment 206 2110 10 8 1...

Страница 43: ...000 4 5 1995 Surge Immunity Power Leads IEC 61000 4 6 1995 Conducted Immunity Power and I O Leads IEC 61000 4 11 1994 Voltage Dips and Interupts The Technical Construction file is maintained at Wilks...

Отзывы: