background image

 

 

 

 Fireplace Assembly Instructions 

1.

 

Start by building a minimum 8” high x 25” deep, 44” wide base of bricks or blocks. Let dry 

overnight. Fill the interior cavity with sand and compact level with top of base A. 

 

 

            

      

2.

 

Place base piece B (piece without refractory bricks) on base A.  Check for level and trace outline 
of the base B.  Remove piece B and apply a thin coating of mortar on the area you have traced. 
Use the same mortar mixture (see page 1) to attach.  Make sure base is level. 

 

 

3.

 

Place fireplace side walls C and back wall D over base B. Do not use mortar in these joints.  

 

 
 
 
 

 
 

Содержание Fireplace

Страница 1: ...Fireplace Owner s Manual 800 579 2797 323 255 6578 Fax 323 306 5689 Info wildwoodovens com www wildwoodovens com 5050 La Roda Ave Los Angeles CA 90041 ...

Страница 2: ...Fireplace Assembly Instructions Toll Free Help Line 800 579 2797 Kit Contents 3 base pieces 3 side wall pieces 3 flue pieces 1 Damper 2 Tubes Fireplace Cement ...

Страница 3: ...level with top of base A 2 Place base piece B piece without refractory bricks on base A Check for level and trace outline of the base B Remove piece B and apply a thin coating of mortar on the area you have traced Use the same mortar mixture see page 1 to attach Make sure base is level 3 Place fireplace side walls C and back wall D over base B Do not use mortar in these joints ...

Страница 4: ...eces Place the base of the hood E on top of side walls C making sure it is level and aligned with side walls 5 Install the Damper in the hood s base center by leaving equal distances on each side To open and close the register pull the lever forward and backward 6 Tighten the bolts on the damper ...

Страница 5: ...amper to make sure it opens and closes easily 8 Place hood piece G over piece F in the same fashion as the last Place the 2 refractory brick bases B2 and B3 over base B without mortar 9 Grout all internal joints of the fireplace with the refractory grout supplied with the kit ...

Страница 6: ...th high temperature stove cement 2 Seal all gaps with high temperature stove cement 3 In the case of using round tubing directly into the hood grout gaps around pipe with refractory grout leaving no remaining space between the tube and the chimney pipe 4 Place approved spark arrestor chimney cap on top of chimney pipe check local codes All chimneys systems to be UL listed for solid fuel burning Co...

Отзывы: