background image

 

SITING THE APPLIANCE

 

 

Fireplace Opening 

 

The fireplace opening must be between 405mm and 450mm wide and between 555mm and 570mm high. If 
the opening intended for the appliance is in excess of these dimensions then a suitable surround  must be 
constructed of non-combustible material to produce an opening within this range of dimensions. 

A flat face of a minimum 470mm wide and 590mm high must be provided around the fireplace opening to ensure a 
good seal is formed. In addition it is important to ensure that the base of the fireplace opening is flat and level with 
the hearth surface to ensure a secure and aligned installation of the appliance. 
 
The  minimum  hearth  dimensions  are  shown  in  the  diagram  above.  The  upper  surface  of  the  hearth  must  be  a 
minimum  of  50mm  above  the  floor  and  must  protrude  a  minimum  distance  of  300mm  out  from  the  fireplace 
opening. (It is important to note that should a spacer of any kind be used to bring the appliance out of the fireplace, 
then the 300mm dimension must be taken from the most forward surface of this spacer. 
 

Installation into a Brick Chimney 

When  the  appliance  is  being  installed  into  a  brick  chimney  there must  be  sufficient  depth  behind  the  appliance  to 
accommodate any falling debris. This debris collection void should be capable of accommodating up to twelve (12)
litres of volumetric space. 

Installation into a Prefabricated Twin Wall  Metal Flue Box 

This appliance can be installed into a prefabricated metal twin wall flue box providing it complies to the requirements 
of BS715 / BS EN 1856-2. The box must have an insulated flue with a minimum diameter of 125mm (5”) diameter and 
a minimum effective overall height of 3 metres. 
 
The top outer face of the flue box should be insulated to prevent heat loss with a layer of mineral wool insulation or 
similar. The metal flue box must stand on a non-combustible surface with a minimum thickness of 12mm. 
 

Installation into a PRE-CAST FLUE Installation 

If the XE product is being fitted see IMPORTANT NOTE on page 4 of these instructions.  
 
Ensure  that  there  is  a  minimum  of  125mm  from  the  front  of  the  fireplace  opening  to  the  rear  of  the  flue  starter 
block—this is to ensure that sufficient clearance is allowed for debris collection.  
 

Содержание CERALIS

Страница 1: ...o ensure that the customer is able to fully operate the appliance and is aware of any cleaning or maintenance requirements MONTESE GAS FIRE MONTESE XE GAS FIRE ELLIPSIS GAS FIRE Model numbers F 021XX1...

Страница 2: ...Appliance 7 Connecting the Appliance to the Gas Supply 8 Checking Operation of Appliance 8 Completing the Installation 9 Appliance Technical Information 10 Cleaning Instructions 10 Service Instruction...

Страница 3: ...g which must be constructed of non combustible materials confirming to BS1251 or a suitable flue box complying with the requirements of BS715 BS EN 1856 2 If the product is being installed into a buil...

Страница 4: ...peated If the spillage test continues to fail expert advise should be sought and additional ventilation may have to be provided This appliance must only be installed on to a suitable hearth with a min...

Страница 5: ...om the most forward surface of this spacer Installation into a Brick Chimney When the appliance is being installed into a brick chimney there must be sufficient depth behind the appliance to accommoda...

Страница 6: ...all installation to ensure loose ceramics cannot fall from the appliance In addition it is imperative that ONLY fascia trim arrangements supplied by Hearth Products deemed suitable to be used with Hea...

Страница 7: ...the second foam length which is supplied with the spacer kit should be affixed to the rear face of the spacer Do not use any permanent sealing substance as this will invalidate warranty as the applian...

Страница 8: ...to the OFF position and back to the IGN position to generate the spark at the electrode Check that the spark is being generated correctly at the pilot assembly Continue with this procedure until the...

Страница 9: ...mer aware of the health and safety warning detailed later in these instructions Explain to the customer that the ceramics are fragile and must be treated with great care explain that the ceramics are...

Страница 10: ...omatically due to a starvation of air at the pilot burner This can often be remedied by performing the cleaning operation detailed here If this procedure does not resolve such a problem then the pilot...

Страница 11: ...carrying components will require the removal of the burner tray The following information details the removal of this tray Once removed refer to the relevant section that follows detailing the removal...

Страница 12: ...cover panel 2 Undo the pilot gas supply from the base of the pilot 3 Remove the thermocouple nut from the back of the valve 4 Remove the two quick connect terminals from the switch circuit 5 Remove t...

Страница 13: ...urn to the IGN symbol for pilot only or symbol to turn off IMPORTANT NOTE Should the spark generator fail to provide a spark at the electrode it may be that a small amount of soot has fallen from the...

Страница 14: ...any component into position if it does not fit easily then you are not fitting the part correctly These instructions can also be followed to remove or reinstall the fuel bed after cleaning This is a p...

Страница 15: ...two side cheeks into position as shown in the picture below These are marked L and R for left hand and right hand Step 4 Carefully place four coals between the front rail and the fuel bed as shown in...

Страница 16: ...Step 5 Fit three coals into position as shown in the picture below Step 6 Fit two coals into position as shown in the picture below Step 7 Fit the three coals into position as shown in the picture bel...

Страница 17: ...any component into position if it does not fit easily then you are not fitting the part correctly These instructions can also be followed to remove or reinstall the fuel bed after cleaning This is a...

Страница 18: ...e cheeks into position as shown in the picture below These are marked L and R for left hand and right hand Step 4 Carefully place medium pebbles from bag A between the front rail and the fuel bed as s...

Страница 19: ...rked B into position as shown in the picture below Step 6 Fit two large pebbles from bag marked B into position as shown in the picture below Step 7 Fit the three small round pebbles from bag marked C...

Страница 20: ...ek LH Pebble P XX1134 Ceramic Sidecheek RH Pebble P XX1135 Ceramic Loose Fuel Pack Pebble Due to our policy of continual product improvement some diagrams and small details may not be accurate however...

Отзывы: