background image

 7. Maintenance, cleaning and servicing 

 

WIKA Operating Instruction, CPP4000-X 

27 

EN 

14

15

54

60

.0

 08

/20

16

 GB

 

7.2.6 

Hub assembly 

1.

 

Unscrew the ram from the spindle. NOTE: left hand thread. 

2.

 

Unscrew the spokes from the hub. 

3.

 

Knock out the spring pin (1), found at the bottom of one of the tapped spoke holes in the hub, 
using a punch 6 mm dia. Pull off hub. 

4.

 

The hub locating plate and thrust bearing can now be removed from the spindle. 

5.

 

If the flanged bush (2) is to be renewed, it should be pressed out of the locating plate and a new 
one pressed in squarely. 

6.

 

The thrust bearing (3) is renewed as a complete assembly. 

7.

 

The nut, pin and spindle sub-assembly (4) can only be replaced as a matched pair. Unscrew the 
nut from the ram, gripping in a soft jaw vice and screw in the new nut. 

8.

 

Assemble the thrust bearing, locating plate and hub on to the spindle, lubricating with 
molybdenum disulphide grease. 

9.

 

Clamp these items together to eliminate end play and re-assemble spring pin. If using new 
spindle drill through 6.3 mm diameter to fit spring pin (1). 

10.

 

Lubricate the thread with molybdenum disulphide grease and screw into ram nut. 

7.3

 

Cleaning 

7.3.1 

Cleaning the unit and checking the liquid levels. 

 
Oil operation 
Keep the system clean and free from spilt oil. Wipe out the oil cups under the gauge stands as 
necessary. Do not use any cleansing solvents as they may damage the seals. 
 
Ensure that the reservoir contains sufficient liquid to carry out any calibrations required. If necessary 
top up the reservoir with the same liquid that is already being used. Do not mix various types or 
brands of liquid in the pressure balance. 
 
If the oil in the test pump becomes dirty, attach a drain to the test connection and use the spindle 
pump to flush through clean oil. (An angle connection is suitable). The spindle pump should be 
turned fully clockwise before starting. 
 

 

Wear safety goggles! 
Protect eyes from flying particles and liquid splashes. 

 

 

For information on returning the instrument see chapter 8.1 “Return”. 

 
.

Содержание DH Budenberg CPP4000-X

Страница 1: ...Hydraulic comparison test pump model CPP4000 X EN Hydraulic comparison test pump model CPP4000 X Operating instructions ...

Страница 2: ...ction model CPP4000 X Page 2 31 Further languages can be found at www wika com 2016 WIKA Alexander Wiegand SE Co KG All rights reserved WIKA is a registered trademark in various countries Prior to starting any work read the operating instructions Keep for later use ...

Страница 3: ...tion 11 3 2 Scope of delivery 11 3 3 Base unit 11 3 3 1 Spindle pump 13 3 3 2 Reservoir 13 3 3 3 Control valves 13 3 3 4 Connection blocks 13 3 4 Function 13 4 Transport packaging and storage 15 4 1 Transport 15 4 2 Packaging and storage 15 5 Commissioning operation 16 5 1 Unpacking the hydraulic comparison test pump 16 5 2 Environmental requirement 16 5 3 Assembly of base units Fastening base to ...

Страница 4: ...2 Corrective maintenance 24 7 2 1 General 24 7 2 2 Removing the cover 26 7 2 3 Reservoir seals 26 7 2 4 Valve seals 26 7 2 5 Spindle pump 26 7 2 6 Hub assembly 27 7 3 Cleaning 27 7 3 1 Cleaning the unit and checking the liquid levels 27 8 Dismounting return and disposal 28 8 1 Return 28 8 2 Disposal 28 9 Specifications 29 10 Accessories 31 Declarations of conformity can be found online at www wika...

Страница 5: ...ydraulic comparison test pump The operating instructions are part of the instrument and must be kept in the immediate vicinity of the model CPP4000 X hydraulic comparison test pump and readily accessible to skilled personnel at any time Skilled personnel must have carefully read and understood the operating instructions prior to beginning any work The general terms and conditions contained in the ...

Страница 6: ...nd reference measuring instrument which can be used in any order If one connects the test item and a sufficiently accurate reference measuring instrument to the test pump on actuating the pump the same pressure will act on both instruments By comparison of the two measured values at any given pressure value a check of the accuracy and or adjustment of the pressure measuring instrument under test c...

Страница 7: ...ring instruments with the required care protect from humidity impacts strong magnetic fields static electricity and extreme temperatures do not insert any objects into the instrument or its openings If the instrument is transported from a cold into a warm environment the formation of condensation may result in instrument malfunction Before putting it back into operation wait for the instrument tem...

Страница 8: ...azards that could impair their safety or health during work When carrying out the various tasks on and with the instrument the skilled personnel must wear personal protective equipment Follow the instructions displayed in the work area regarding personal protective equipment The requisite personal protective equipment must be provided by the operating company Wear safety goggles Protect eyes from ...

Страница 9: ... m Fire extinguishing media CO2 dry chemical foam or water fog Spillage Soak with absorbent clay or proprietary absorbent Waste disposal Burn or dump in approved area Emergency treatment of acute effects Ingestion Do not induce vomiting Administer 250 ml milk or olive oil The main hazard following accidental ingestion is aspiration of liquid into lungs Aspiration Send to hospital immediately Inhal...

Страница 10: ...roduct label 1 Model 2 Serial number 3 Pressure 4 Date of manufacturing 5 Permissible pressure medium 2 7 2 Symbols Before mounting and commissioning the instrument ensure you read the operating instructions CE Communauté Européenne Instruments bearing this mark comply with the relevant European directives 2 3 4 5 1 ...

Страница 11: ...e sealing face VG22 mineral oil 0 5 litre Tool and maintenance set consisting of 1 hexagon wrench key 3 mm A F o 1x 30 mm A F open ended spanners o 2x G1 2 differential nut connections o 1x G3 8 differential nut connection o 1x Sealing coned joint o 2x Sealing coned joint 1 end recessed o 1x spirit level o 4x level plates 1 bag of seals o 1x pointer punch o 1x pointer remover Operating instruction...

Страница 12: ...4 Design and Function 12 WIKA Operating Instruction model CPP4000 X EN 14155460 00 08 2016 GB Sectioned view of spindle pump ...

Страница 13: ... 3 3 Control valves Two control valves are provided on the top of reservoir high pressure cylinder block The valve mechanisms are built into the reservoir high pressure cylinder block and they control the flow of liquid through internal drillings in the reservoir high pressure cylinder block The rear valve is referred to as valve A and is used to control the output from the high pressure ram of th...

Страница 14: ...essure part of the spindle pump and valve B is opened to allow the liquid in the low pressure part of the spindle pump to return to the reservoir as the pump is operated This ensures that the pump can be operated without having to put large forces on the spindle pump handwheel To release the test pressure the spindle pump is wound out and valve A is opened ...

Страница 15: ...ovide optimum protection during transport e g change in installation site sending for repair Permissible conditions at the place of storage Storage temperature 10 50 C Humidity 35 85 relative humidity no condensation Avoid exposure to the following factors Direct sunlight or proximity to hot objects Mechanical vibration mechanical shock putting it down hard Soot vapour dust and corrosive gases Pot...

Страница 16: ...fficient space to operate is required 5 3 Assembly of base units Fastening base to bench The base is to be mounted on a firm level table or bench about 0 9 m high The centre line of the front adjustable feet of the unit should be about 40 mm from the front edge of the bench to allow adequate clearance for the handwheel 1 Mark the position of the adjustable feet of the unit on the top of the bench ...

Страница 17: ...voir if necessary Wear safety goggles Protect eyes from flying particles and liquid splashes 5 4 3 Post assembly test 1 Carry out a test calibration of a known instrument see chapter 5 5 Procedure to ensure that the unit is working correctly 2 Release the pressure and remove the test instrument Information To remove the instrument from the system use the appropriate size of spanners on the top sec...

Страница 18: ...generate pressure up to approximately 4 000 bar or 60 000 lb in 5 5 2 During calibration Increase the pressure via the spindle pump in the clockwise direction or use the fine adjustment to approach the individual calibration points The display of the pressure measuring instrument being tested can be compared with the reference measuring instrument at the individual calibration points Information I...

Страница 19: ...r use with pressure gauges which are fitted with coiled Bourdon tubes nor any gauges which are to be used on oxygen as complete removal of oil is not assured Please contact DH Budenberg WIKA Equipment This consists of a syringe and a special needle with the point bent through 90 Instructions 1 Fill syringe with solvent suitable cold degreasing liquid 2 With gauge connection pointing upwards put ne...

Страница 20: ...6 Commissioning operation 20 WIKA Operating Instruction model CPP4000 X EN 14155460 00 08 2016 GB ...

Страница 21: ...r valve seat damaged Examine condition of valve B and valve seat Replace valve assembly or return test pump to DH Budenberg WIKA for overhaul as necessary If unable to locate a cause Return test pump to DH Budenberg WIKA for investigation Equipment provides pressure but pressure decays to zero Incorrect operating procedure being used Ensure that correct operating procedure is being followed see ch...

Страница 22: ...l damage Return test pump to DH Budenberg WIKA for investigation Incorrect operating procedure being used Ensure that correct operating procedure is being followed see chapter 5 5 Procedure If unable to locate a cause Return test pump to DH Budenberg WIKA for investigation The spindle pump of the test pump becomes very stiff to operate when the test pump is being used in the range below 140 bar 2 ...

Страница 23: ... by means of the measures listed above shut down the test pump immediately and ensure that pressure is no longer present and secure the instrument from being put back into operation inadvertently In this case contact the manufacturer If a return is needed please follow the instructions given in chapter 8 1 Return ...

Страница 24: ... maintenance should be necessary If required the system can be returned to the manufacturer for re conditioning Fluids which attack ABS should be used with caution Continual immersion of the cover in such fluids will cause deterioration Spillage s should be wiped off immediately 7 2 Corrective maintenance 7 2 1 General This section contains details on stripping the unit and replacing the spare par...

Страница 25: ...7 Maintenance cleaning and servicing WIKA Operating Instruction CPP4000 X 25 EN 14155460 0 08 2016 GB ...

Страница 26: ...7 2 5 Spindle pump 1 Using a 4 mm hexagon wrench key unscrew the six socket head cap screws secur ing the hub locating plate These are positioned inside the recess in the back of the aluminium hub 2 By carefully pulling the hub the complete ram assembly can now be withdrawn from the barrel During this operation a container is required beneath the barrel to catch any liquid 3 Unscrew the ram from t...

Страница 27: ...p these items together to eliminate end play and re assemble spring pin If using new spindle drill through 6 3 mm diameter to fit spring pin 1 10 Lubricate the thread with molybdenum disulphide grease and screw into ram nut 7 3 Cleaning 7 3 1 Cleaning the unit and checking the liquid levels Oil operation Keep the system clean and free from spilt oil Wipe out the oil cups under the gauge stands as ...

Страница 28: ...acids bases solutions etc When returning the instrument use the original packaging or a suitable transport packaging To avoid damage 1 Wrap the instrument in an antistatic plastic film 2 Place the instrument along with shock absorbent material in the packaging Place shock absorbent material evenly on all sides of the transport packaging 3 If possible place a bag containing a desiccant inside the p...

Страница 29: ...ow pressure piston 31 2 mm Piston diameter high pressure piston 6 35 mm Displacement approx 5 cm Material Wetted parts Austenitic stainless steel high tensile brass nitrile rubber Permissible ambient conditions Operating temperature 0 40 C Instrument base Dimensions 401 x 397 x 155 mm W x D x H for details see technical drawings Weight 13 5 kg 1 Other pressure transmission media on request Storage...

Страница 30: ...9 Specifications 30 WIKA Operating Instruction model CPP4000 X EN 14155460 00 08 2016 GB Dimensions in mm Test Connection ...

Страница 31: ...cone material stainless steel hardened 46858410 Adapter for test item connection G B male on M16 x 1 5 male with sealing cone material stainless steel hardened 57340075 Adapter for test item connection G B male on 9 16 18 UNF male with sealing cone material stainless steel hardened 46858411 Adapter for test item connection G B male on G1 2 female O ring seal 46858412 Sealing and maintenance set fo...

Отзывы: