Page 21
Euromat 64
V16-01 9
401-110-001-EN
3.6.2 Plumbed-in water connection
For the steaming unit and the automatic self-cleaning system (optional)
The water supply must be of drinking water quality (according
to drinking water ordinance).
The water temperature should not 50 °C.
The water connections must be made within the specified
installation window, but not higher than the electrical connec-
tion.
The water connection has to be accessible also after the
installation. We recommend installing a stopcock on site if the
above is not possible.
The flow pressure of the water must not exceed 600 kPa.
A pressure regulator must otherwise be installed on site.
The minimum water pressure that is necessary for the auto-
matic self-cleaning system is 150 kPa.
Installation window water connection
3.6.2.1 Connecting a water filtration system
The steaming unit should only be supplied with drinking water, which flows through an appropriate water
filter.
What is known as “complete demineralisation” of the water is important for the
proper functioning of the appliance and its steam system. The filter-head is set
to level “0”. All the water flows through the water filter, and no unfiltered water is
mixed in via the bypass.
■
Pay attention to the notes in the user information of the water filter
1100 mm
400 mm
INFORMATION
A tap with pipe aerator and backflow preventer, tested according to DIN - DVGW,
must be available on site for the water connection.
A class “ED” backflow preventer is not to be used.
Only ever use the supplied new water intake hose for the water connection.
This is a foodsafe ½″ pressure hose with a ¾″ threaded joint tested according to
DIN-DVGW (WIESHEU GmbH item no. 104476). Make the connection flexible
such that it is possible to move the appliance one metre away from the wall for
servicing.
Do not use any old hose sets to connect the appliances.